99
High Gap
This is a hysteresis of the High Limit Point and the High Hyst
Point.
Buck Transfer
Point Setting
With AVR Off these settings have no effect.
Buck High
Point
VAC voltage setting at which the UPS switches from On Line to
Buck mode operation ( step down voltage ).
Buck Low
Point
This is the VAC voltage level down to which the VAC input must
lower (after being above Buck High Point ) before qualifying for
On Line operation.
Boost
Transfer Point
Setting
With AVR Off these settings have no effect.
Boost High
Point
VAC voltage setting at which the MP2000E switches from On Line
to Boost mode operation ( step up voltage ).
Boost Low
Point
This is the VAC voltage level down to which the VAC input must
raise (after being below Boost Low Point ) before qualifying for
On Line operation.
Low Voltage
Transfer Point
Setting
This is the VAC input voltage level at which the MP2000E
switches from On Line to On Battery.
Low Limit
Point
VAC voltage setting at which the MP2000E switches from On Line
to On Battery.
Low Hyst
Point
Low Hysteresis Point
– This is the VAC voltage level up to which
the VAC input must rise (after being below Low Limit Point)
before qualifying for On Line operation.
Low Gap
This is a hysteresis of the Low Limit Point and the Low Hyst
Point.
AVR Feature
Setting
Turn On or Off boost and / or buck operation.
Figure 6-62: AVR Transfer Point Form Fields
Содержание MP Series
Страница 3: ...III ...
Страница 20: ...20 STEP 1 Connect CONTROL Wires ...
Страница 22: ...22 Installation and Troubleshooting Guide Figure 9 ...
Страница 30: ...30 MP2000E System Battery Backup System Section 2 Operator s Manual ...
Страница 49: ...49 Figure 21 Note See Section 2 2 14 For details on Event Log View under Maintenance submenu ...
Страница 51: ...51 2 2 8 Status Submenu CONT D ...
Страница 70: ...70 2 3 3 Main Menu ...
Страница 72: ...2 3 4 1 RS232 USB Menu Tree ...
Страница 74: ...74 ...
Страница 104: ...104 Figure 6 70 SMS for Event Log Screen ...
Страница 126: ...126 ...
Страница 148: ...148 ...