23
1.4 Start-Up and Test
Purpose: Describes how to Start-up and test the system.
TIP: If the system does not perform as described below, see the troubleshooting section in
Section 1.6 of this manual.
STEP 1: Turn on the Utility Input line Power
START
STARTUP PROCEDURE TIPS
The BBS automatically starts up in Standby mode.
After the AC line is qualified (default 30 seconds)
the BBS switches to On Line mode.
The PTS is a safeguard that the cabinet will always
revert to utility power if there is ever a failure of
the MP2000E BBS or batteries.
GO TO STEP 2
STEP 2: Turn on the BBS
START
GO TO STEP 3
After the AC Input & Output as well
as
Battery Utility Circuit Breakers on the
MP2000E are OFF
Turn ON the upstream Utility Input
Circuit Breaker
Verify the load is turned ON
Turn on the Battery
Circuit Breaker
Turn On the AC in
put & output circuit
breaker
The LCD display s
hows Standby
In 30 seconds, The LCD display
changes to " ON LINE", the Green
Output LED is lit indicating Input power
to be within acceptable frequency and
voltage ranges and the output is
powered from utility.
Содержание MP Series
Страница 3: ...III ...
Страница 20: ...20 STEP 1 Connect CONTROL Wires ...
Страница 22: ...22 Installation and Troubleshooting Guide Figure 9 ...
Страница 30: ...30 MP2000E System Battery Backup System Section 2 Operator s Manual ...
Страница 49: ...49 Figure 21 Note See Section 2 2 14 For details on Event Log View under Maintenance submenu ...
Страница 51: ...51 2 2 8 Status Submenu CONT D ...
Страница 70: ...70 2 3 3 Main Menu ...
Страница 72: ...2 3 4 1 RS232 USB Menu Tree ...
Страница 74: ...74 ...
Страница 104: ...104 Figure 6 70 SMS for Event Log Screen ...
Страница 126: ...126 ...
Страница 148: ...148 ...