55/60
ST_PM_ Installation Manual_EN_V1.0 | 08.2020
Copyright © 2020 Mounting Systems GmbH
6.16
Met masts
The wind speed must be measured at a height of 10 m.
The number of met masts must be planned so that the entire plant is covered with a
radius of 400 m per met mast.
Figure 45 Met masts and wind zones position
The mast foundation must be designed according to the wind loads.
Each met mast must be placed within a radius of 25 m of a control cabinet. This control
cabinet must be equipped with a wind sensor connection.
The met mast must be equipped with a lightning rod and grounded accordingly.