For the entire duration of the installation and commissioning work, only
authorised, skilled specialists and authorised, trained personnel may enter the
installation area. The operator must ensure appropriate protection.
Personal safety equipment must be worn by anyone commissioned to work on
the tracking system.
The operator must ensure that nobody enters the installation area and that no
work is performed during extreme weather conditions such as storms, heavy
rain, lightning, etc.
Only original components may be used. The original components may not be
modified without the manufacturer's permission.
The photovoltaic modules may only be mounted in the safety position.
Carry out all work carefully and with the safety aspect first.
During all work, note the relevant regulations relating to safety in the
workplace and environmental protection.
Note the instructions on the type panels and warning signs throughout the
system. All signs must be recognisable, legible and free of dirt. Replace any
missing signs.
Keep fastening materials for safety devices safe if they are removed. Reattach
removed safety devices before commissioning.
Do not carry out any welding work in the area of the power plant.
Do not clean the geared motor or control cabinet with high-pressure cleaning
equipment or sharp-edged tools.
Note the permissible tightening torques of the fastening bolts.
Replace any bolts that have become unusable with new bolts of the same
strength class and design.