7/60
ST_PM_ Installation Manual_EN_V1.0 | 08.2020
Copyright © 2020 Mounting Systems GmbH
3
Safety requirements
All technicians must have read and understood these instructions and must comply with
them at all times, in order to:
•
Prevent hazards to life and limb.
•
Safeguard the operational safety of the tracking system.
•
Rule out any system downtime or environmental impacts resulting from incorrect
handling.
Failure to comply with the safety regulations listed below may result in serious
injury or even loss of life.
All electrical work must only be carried out by trained electricians.
No work may be carried out on electronic or electrical components while they
are live.
The tracking system may only be supplied through a TN-S network system.
Only PV modules of protection class II or IEC application class A may be
installed.
Only dual-insulation DC cables approved for photovoltaics (protection class II)
may be used.
The DC cabling may only be secured to the tracker parts designated for this.
The DC cabling must be installed so that it is resistant to grounding faults and
short-circuits.
The operator must provide string monitoring through the inverters.
All work must comply with the country-specific safety regulations.