14.2 TDD Synchronization Installation and Wiring Guidelines
As mentioned in Section
1214H
5.2.4, enabling the TDD Synchronization
25F
26
feature is a two-stage
process:
1. Install GPS Synchronization unit
2. Use web interface to enable and configure parameters
14.2.1 Installing the Recommended GPS Synchronization Kit
The recommended GPS Sync installation kit includes the following:
•
GPS Sync Box unit from MemoryLink (see
1215H
Figure 127), with two attached
terminated Ethernet and Sync cables and cable glands (2) which connect directly
to a PTP 600 Series ODU, and an attached un-terminated Ethernet cable.
•
Mounting bracket and mounting bracket screws
•
Outdoor rated UV resistant cable tie
•
GPS Sync Box User Manual.
In addition to the hardware mentioned above, it is recommended to have an appropriate
lightning protection (ALPU-ORT in Section
1216H
16).
26
TDD Synchronization assumes that the user is familiar with network planning issues. For simple
networks, it is advisable not to use the “Expert Mode” and rely on the configuration wizard.
Содержание MOTOWI 4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 24: ...22 List of Equations 462HEquation 1 Path Loss 955H63 463HEquation 2 Link Loss 956H91 ...
Страница 113: ...111 8 3 3 Detailed Counters Page Figure 53 Detailed Counters Page ...
Страница 139: ...137 Figure 75 Spectrum Management as seen from the Master Figure 76 Spectrum Management as seen from the Slave ...
Страница 183: ...181 Figure 114 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 220: ...218 14 3 2 2 Confirm Settings and Reboot ODU Figure 135 Confirm TDD Synchronization Configuration Parameters ...
Страница 221: ...219 Figure 136 Disarm Following TDD Synchronization ...
Страница 227: ...225 Figure 142 Diagrammatically Showing the E1 T1 Connections ...
Страница 228: ...226 Figure 143 Two E1 T1 120 Ohms signal Balanced to PTP600 Interface ...
Страница 230: ...228 Figure 144 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 233: ...231 Figure 146 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 237: ...235 Figure 149 QPSK 0 63 Single Payload Figure 150 QPSK 0 87 Single Payload ...
Страница 238: ...236 Figure 151 16 QAM 0 63 Single Payload Figure 152 16 QAM 0 87 Single Payload ...
Страница 239: ...237 Figure 153 64 QAM 0 75 Single Payload Figure 154 64 QAM 0 92 Single Payload ...
Страница 240: ...238 Figure 155 256 QAM 0 81 Single Payload Figure 156 16 QAM 0 63 Dual Payload ...
Страница 241: ...239 Figure 157 16 QAM 0 87 Dual Payload Figure 158 64 QAM 0 75 Dual Payload ...
Страница 242: ...240 Figure 159 64 QAM 0 92 Dual Payload Figure 160 256 QAM 0 81 Dual Payload ...