16.3 Surge Arrestor Wiring
An Andrew Grounding Kit and Surge Arrestor Unit must be located at the ODU and reliably
grounded as shown in
1237H
Figure 111. There may also be a regulatory requirement to crossbond
the screened CAT-5 at regular intervals up the mast. Refer to local regulatory requirements
for further details.
A second Surge Arrestor Unit should be mounted at the building entry point and must be
grounded.
The termination of the CAT-5 Cable into the Surge Arrestor Unit is illustrated in
1238H
Table 31,
1239H
Table 32 and
1240H
Figure 146. The screen from the cable must be terminated into the ground
terminal within the unit to ensure the continuity of the screen. Earth Sleeving should be used
to cover the shield ground connection to prevent internal shorting within the unit.
Terminal Identification
Conductor
RJ45 Pin
CON3 Pin 1
Orange/White
1
CON3 Pin 2
Orange
2
CON3 Pin 3
Green/White
3
CON3 Pin 6
Green
6
CON1 Pin 4
Blue
4
CON1 Pin 5
Blue/White
5
CON1 Pin 7
Brown/White
7
CON1 Pin 8
Brown
8
Table 31 - Surge Arrestor ALPU-ORT Cable 1 Termination
Terminal Identification
Conductor
RJ45 Pin
CON4 Pin 1
Orange/White
1
CON4 Pin 2
Orange
2
CON4 Pin 3
Green/White
3
CON4 Pin 6
Green
6
CON2 Pin 4
Blue
4
CON2 Pin 5
Blue/White
5
CON2 Pin 7
Brown/White
7
CON2 Pin 8
Brown
8
Table 32 - Surge Arrestor ALPU-ORT Cable 2 Termination
Содержание MOTOWI 4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 24: ...22 List of Equations 462HEquation 1 Path Loss 955H63 463HEquation 2 Link Loss 956H91 ...
Страница 113: ...111 8 3 3 Detailed Counters Page Figure 53 Detailed Counters Page ...
Страница 139: ...137 Figure 75 Spectrum Management as seen from the Master Figure 76 Spectrum Management as seen from the Slave ...
Страница 183: ...181 Figure 114 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 220: ...218 14 3 2 2 Confirm Settings and Reboot ODU Figure 135 Confirm TDD Synchronization Configuration Parameters ...
Страница 221: ...219 Figure 136 Disarm Following TDD Synchronization ...
Страница 227: ...225 Figure 142 Diagrammatically Showing the E1 T1 Connections ...
Страница 228: ...226 Figure 143 Two E1 T1 120 Ohms signal Balanced to PTP600 Interface ...
Страница 230: ...228 Figure 144 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 233: ...231 Figure 146 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 237: ...235 Figure 149 QPSK 0 63 Single Payload Figure 150 QPSK 0 87 Single Payload ...
Страница 238: ...236 Figure 151 16 QAM 0 63 Single Payload Figure 152 16 QAM 0 87 Single Payload ...
Страница 239: ...237 Figure 153 64 QAM 0 75 Single Payload Figure 154 64 QAM 0 92 Single Payload ...
Страница 240: ...238 Figure 155 256 QAM 0 81 Single Payload Figure 156 16 QAM 0 63 Dual Payload ...
Страница 241: ...239 Figure 157 16 QAM 0 87 Dual Payload Figure 158 64 QAM 0 75 Dual Payload ...
Страница 242: ...240 Figure 159 64 QAM 0 92 Dual Payload Figure 160 256 QAM 0 81 Dual Payload ...