175
The following diagrams (
1180H
Figure 109 &
1181H
Figure 110) show this zoning pictorially:
Equipment mounted in Zone A should be capable of carrying the full lightning current.
Mounting of the ODU in Zone A is not recommended. Mounting in Zone A should only be
carried out observing the rules governing installations in Zone A
24F
25
Failure to do so may put
structures, equipment and life at risk.
Equipment mounted in Zone B should be grounded using grounding wire of at least 10 AWG.
This grounding wire should be connected to a grounding rod or the building grounding system
before entry in to building.
The 600 Series bridge ODU grounding point can be found on the bottom of the unit. The 600
Series Bridge is supplied with an appropriate grounding lug for attachment to the ODU.
11.2 Detailed Installation
The recommended components for an installation protected for nearby strikes are:
•
Grounding Kits — Andrew Type 223158-2 (
481H
http://www.andrew.com
UT
)
•
Screened CAT 5e Cable also known as Shielded CAT 5e or CAT 5e STP (Shielded
Twisted Pair)
•
NB: Only use Outdoor rated, gel filled CAT5e if it contains a shield.
•
Surge Arrestor: Transtector Type ALPU-ORT - 4 per link (
482H
www.transtector.com)
•
Grounding Stake
•
RJ45 screened connectors
•
8 AWG Grounding Cable – Minimum size, preferably 6 or 4
NOTE
: There may be a local regulatory requirement to cross bond the CAT 5e cable at
regular intervals to the mast. This may be as frequent as every 10 meters (33 feet)
25
Local regulations may also require the fitting of the 8 AWG ground wire referred below.
Содержание MOTOWI 4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 24: ...22 List of Equations 462HEquation 1 Path Loss 955H63 463HEquation 2 Link Loss 956H91 ...
Страница 113: ...111 8 3 3 Detailed Counters Page Figure 53 Detailed Counters Page ...
Страница 139: ...137 Figure 75 Spectrum Management as seen from the Master Figure 76 Spectrum Management as seen from the Slave ...
Страница 183: ...181 Figure 114 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 220: ...218 14 3 2 2 Confirm Settings and Reboot ODU Figure 135 Confirm TDD Synchronization Configuration Parameters ...
Страница 221: ...219 Figure 136 Disarm Following TDD Synchronization ...
Страница 227: ...225 Figure 142 Diagrammatically Showing the E1 T1 Connections ...
Страница 228: ...226 Figure 143 Two E1 T1 120 Ohms signal Balanced to PTP600 Interface ...
Страница 230: ...228 Figure 144 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 233: ...231 Figure 146 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 237: ...235 Figure 149 QPSK 0 63 Single Payload Figure 150 QPSK 0 87 Single Payload ...
Страница 238: ...236 Figure 151 16 QAM 0 63 Single Payload Figure 152 16 QAM 0 87 Single Payload ...
Страница 239: ...237 Figure 153 64 QAM 0 75 Single Payload Figure 154 64 QAM 0 92 Single Payload ...
Страница 240: ...238 Figure 155 256 QAM 0 81 Single Payload Figure 156 16 QAM 0 63 Dual Payload ...
Страница 241: ...239 Figure 157 16 QAM 0 87 Dual Payload Figure 158 64 QAM 0 75 Dual Payload ...
Страница 242: ...240 Figure 159 64 QAM 0 92 Dual Payload Figure 160 256 QAM 0 81 Dual Payload ...