35
The Recovery switch is used to recover the unit from configuration errors or software image
corruption. To put a PTP 600 Series Bridge into Recovery mode the Recovery switch should
be pressed then the power applied. The Recovery switch should be kept pressed for at least
20 seconds after the power has been applied. Full instruction on the recovery mode can be
found in Section
969H
9 “
970H
Recovery Mode”.
A simple reboot can be performed by removing and re-applying the mains power to the PTP
600 Series Bridge PIDU Plus.
On the left hand side of the PIDU Plus, 48V DC input and output connections can be found.
These are used to power the PTP 600 Series Bridge from an external DC source or to
provide a level of power supply redundancy, as shown in Section
971H
1.3.3 “
972H
Redundancy and
Alternate Powering Configurations”.
WARNING
When using alternate DC supplies the supply MUST comply with the following
requirements:
•
The voltage and polarity is correct and is applied to the correct terminals in the PIDU Plus
•
The power source is rated as SELV
•
The power source is rated to supply at least 1A continuously, and
•
The power source cannot provide more than the Energy Hazard Limit as defined by
IEC/EN/UL6090, Clause 2.5, Limited Power (The Energy Hazard Limit is 240VA)
Also on the left hand side of the PTP 600 Series Bridge PIDU Plus, connectors and jumpers
can be found that allow the remote connection of power LED, Ethernet LED and Recovery
switch. The connection instructions can be found in Section
973H
1.3.4 “
974H
Remote LEDs and
Recovery Switch”
The input supply range for the 600 Series PIDU Plus is 100V-240V AC, 47-63Hz. Mains
connection to the PIDU Plus is made using a standard “figure of eight” mains lead as shown
in
975H
Figure 6.
Figure 6 – PTP 600 Series Bridge PIDU Plus Power Input
Содержание MOTOWI 4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 24: ...22 List of Equations 462HEquation 1 Path Loss 955H63 463HEquation 2 Link Loss 956H91 ...
Страница 113: ...111 8 3 3 Detailed Counters Page Figure 53 Detailed Counters Page ...
Страница 139: ...137 Figure 75 Spectrum Management as seen from the Master Figure 76 Spectrum Management as seen from the Slave ...
Страница 183: ...181 Figure 114 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 220: ...218 14 3 2 2 Confirm Settings and Reboot ODU Figure 135 Confirm TDD Synchronization Configuration Parameters ...
Страница 221: ...219 Figure 136 Disarm Following TDD Synchronization ...
Страница 227: ...225 Figure 142 Diagrammatically Showing the E1 T1 Connections ...
Страница 228: ...226 Figure 143 Two E1 T1 120 Ohms signal Balanced to PTP600 Interface ...
Страница 230: ...228 Figure 144 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 233: ...231 Figure 146 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 237: ...235 Figure 149 QPSK 0 63 Single Payload Figure 150 QPSK 0 87 Single Payload ...
Страница 238: ...236 Figure 151 16 QAM 0 63 Single Payload Figure 152 16 QAM 0 87 Single Payload ...
Страница 239: ...237 Figure 153 64 QAM 0 75 Single Payload Figure 154 64 QAM 0 92 Single Payload ...
Страница 240: ...238 Figure 155 256 QAM 0 81 Single Payload Figure 156 16 QAM 0 63 Dual Payload ...
Страница 241: ...239 Figure 157 16 QAM 0 87 Dual Payload Figure 158 64 QAM 0 75 Dual Payload ...
Страница 242: ...240 Figure 159 64 QAM 0 92 Dual Payload Figure 160 256 QAM 0 81 Dual Payload ...