
All
disclosures,
notices
and
warranty
conditions
are
being
written
on
the
back
of
the
box.
Released
on
27
th
of
October,
2009.
Installation and mounting manual for EK-FC285 GTX Classified water block
This product is intended for installation only by expert users. Please consult with a qualified technician for installation. Improper installation may result in damage to your equipment. EK Water Blocks assumes no liability
whatsoever, expressed or implied, for the use of these products, nor their installation. The following instructions are subject to change without notice. Please visit our web site at
www.ekwaterblocks.com
for updates.
Before installation of this product please read important notice, disclosure and warranty conditions printed on the back of the box.
The barb hose fittings require only a small amount of force to screw them in; otherwise the high flow fittings might break. These fittings do not need to be tightened with much force because the
liquid seal is made using o-rings.
STEP 1: GENERAL INFORMATION. Sample picture of GeForce 285 GTX Classified graphic card.
STEP 2: PREPARING YOUR GRAPHIC CARD.
1. REMOVING STOCK COOLER. Remove all encircled screws. All heat sink
assembly screws should be removed. There are 12 screws on the back of the
graphic card.
2. CLEANING THE PCB. Carefully detach the original heat sink after removing
all fasteners securing it to the board and bracket. Wipe off the remains (by
using non–abrasive cloth or Q-tip, as shown on sample photo) of the original
thermal compound until the components and circuit board are completely
clean. EKWB does not recommend using any liquids for removing paste.
3. APPLYING THERMAL COMPOUND
Apply thermal compound: lightly coat the GPU with for example Arctic Cooling
MX2 ™ or MX3 ™ thermal compound. Follow this link:
http://www.arctic-cooling.com/catalog/images/install_mx2_retail.pdf
for
detailed instructions. EKWB recommends to apply thermal grease in cross form
for best performance (see sample picture).
4. CUTTING THERMAL PADS. Your block comes with thermal pads, which have
to be placed on chips (PLEASE REMOVE FOIL ON BOTH SIDES OF THERMAL
PADS PRIOR TO INSTALLATION. WARNING: DIMENSION BELLOW ARE
SCALED.)
5. PLACING THERMAL PADS ON PCB. Place thermal pads on chips so that
numbers on chips match size of thermal pads. Thermal pad number 2 will have
to be cut by user to match all small mosfet chips (EKWB made sure users have
more than enough pads to cover all surfaces that need to be covered to make
block fully function). You can also use small drop of thermal grease on chips to
make thermal pads more adhesive.
6. PLACING STANDOFFS ON BLOCK. Standoffs are obligatory to make this
block fully functional. Please use small amount of thermal grease on standoffs
and glue them so they are concentric with mounting holes. Once they are
stuck to block be careful not to move them.
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
15,6x13mm
60x50mm
2
1