8
36H
5.2.4
PTP Approach for Using TDD Synchronization ....................................................................
529H
47
37H
5.3
Region Codes........................................................................................................................
530H
48
38H
5.4
Operational Restrictions........................................................................................................
531H
49
39H
5.4.1
Radar Avoidance...................................................................................................................
532H
49
40H
5.4.2
RTTT Avoidance and Other Channel Use Restrictions ........................................................
533H
51
41H
5.4.3
Radar Avoidance, i-DFS and Variable (Narrow) Bandwidth Operation ................................
534H
52
42H
5.5
2.5GHz Specific Frequency Planning Considerations ..........................................................
535H
52
43H
5.5.1
Variable Channel Bandwidth Operation................................................................................
536H
52
44H
5.5.2
Power Reduction in the Upper Band.....................................................................................
537H
54
45H
5.6
5.4GHz Specific Frequency Planning Considerations ..........................................................
538H
55
46H
5.6.1
Raster Considerations...........................................................................................................
539H
57
47H
5.6.2
Transmit Power Reduction at the Band Edges .....................................................................
540H
57
48H
5.7
5.8GHz Specific Frequency Planning Considerations ..........................................................
541H
57
49H
5.7.1
Raster Considerations...........................................................................................................
542H
59
50H
5.7.2
Transmit Power Reduction at the Band Edges .....................................................................
543H
59
51H
5.8
Distance ................................................................................................................................
544H
60
52H
5.9
Networking Information .........................................................................................................
545H
61
53H
5.10
Lightning Protection...............................................................................................................
546H
61
54H
5.11
Electrical Requirements ........................................................................................................
547H
61
55H
6
Site Planning........................................................................................................................
548H
62
56H
6.1
Site Selection Criteria............................................................................................................
549H
62
57H
6.1.1
ODU Site Selection ...............................................................................................................
550H
62
58H
6.1.2
PTP 600 Series Bridge PIDU Plus Site Selection.................................................................
551H
62
59H
6.1.3
Path Loss Considerations .....................................................................................................
552H
63
60H
6.1.4
Definitions..............................................................................................................................
553H
63
61H
6.1.5
2.5 GHz Product Variant - Receive Sensitivity, Link Loss, Output Power and Threshold Vs
Modulation Mode ..................................................................................................................................
554H
64
62H
6.1.6
5.4 GHz Product Variant - Receive Sensitivity, Link Loss, Output Power and Threshold Vs
Modulation Mode ..................................................................................................................................
555H
65
63H
6.1.7
5.8 GHz Product Variant - Receive Sensitivity, Link Loss, Output Power and Threshold Vs
Modulation Mode ..................................................................................................................................
556H
66
64H
7
Installation ...........................................................................................................................
557H
67
65H
7.1
Preparation............................................................................................................................
558H
67
66H
7.2
Installation Procedure ...........................................................................................................
559H
67
67H
7.3
Tools Required ......................................................................................................................
560H
67
68H
7.4
Installation Support................................................................................................................
561H
68
69H
7.5
Legal Disclaimer....................................................................................................................
562H
68
Содержание MOTOWI 4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 24: ...22 List of Equations 462HEquation 1 Path Loss 955H63 463HEquation 2 Link Loss 956H91 ...
Страница 113: ...111 8 3 3 Detailed Counters Page Figure 53 Detailed Counters Page ...
Страница 139: ...137 Figure 75 Spectrum Management as seen from the Master Figure 76 Spectrum Management as seen from the Slave ...
Страница 183: ...181 Figure 114 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 220: ...218 14 3 2 2 Confirm Settings and Reboot ODU Figure 135 Confirm TDD Synchronization Configuration Parameters ...
Страница 221: ...219 Figure 136 Disarm Following TDD Synchronization ...
Страница 227: ...225 Figure 142 Diagrammatically Showing the E1 T1 Connections ...
Страница 228: ...226 Figure 143 Two E1 T1 120 Ohms signal Balanced to PTP600 Interface ...
Страница 230: ...228 Figure 144 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 233: ...231 Figure 146 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 237: ...235 Figure 149 QPSK 0 63 Single Payload Figure 150 QPSK 0 87 Single Payload ...
Страница 238: ...236 Figure 151 16 QAM 0 63 Single Payload Figure 152 16 QAM 0 87 Single Payload ...
Страница 239: ...237 Figure 153 64 QAM 0 75 Single Payload Figure 154 64 QAM 0 92 Single Payload ...
Страница 240: ...238 Figure 155 256 QAM 0 81 Single Payload Figure 156 16 QAM 0 63 Dual Payload ...
Страница 241: ...239 Figure 157 16 QAM 0 87 Dual Payload Figure 158 64 QAM 0 75 Dual Payload ...
Страница 242: ...240 Figure 159 64 QAM 0 92 Dual Payload Figure 160 256 QAM 0 81 Dual Payload ...