12
178H
13.8.5
Mounting the Connectorized 600 Series Bridge .................................................................
671H
199
179H
13.8.6
Mounting the antennas........................................................................................................
672H
199
180H
13.8.7
Alignment Process ..............................................................................................................
673H
200
181H
13.8.8
Aligning Dual Polar Antennas .............................................................................................
674H
200
182H
13.8.9
Aligning Separate Antennas................................................................................................
675H
200
183H
13.8.10
Completing the Installation..................................................................................................
676H
201
184H
13.8.11
Antenna Cable Fixing..........................................................................................................
677H
201
185H
13.8.12
Antenna Connection Weatherproofing................................................................................
678H
201
186H
13.9
Additional Lightning Protection............................................................................................
679H
203
187H
13.9.1
ODU Mounted Outdoors .....................................................................................................
680H
203
188H
13.9.2
ODU Mounted Indoors ........................................................................................................
681H
204
189H
14
TDD Synchronization Configuration and Installation Guide ........................................
682H
205
190H
14.1
Introduction..........................................................................................................................
683H
205
191H
14.2
TDD Synchronization Installation and Wiring Guidelines....................................................
684H
206
192H
14.2.1
Installing the Recommended GPS Synchronization Kit ......................................................
685H
206
193H
14.3
Configuring the TDD Synchronization Feature ...................................................................
686H
209
194H
14.3.1
TDD Synchronization Enable ..............................................................................................
687H
209
195H
14.3.2
TDD Synchronization Configuration Menu..........................................................................
688H
210
196H
14.3.2.1
TDD Synchronization Configuration – Expert Mode ...........................................................
689H
214
197H
14.3.2.2
Confirm Settings and Reboot ODU .....................................................................................
690H
218
198H
15
E1/T1 Installation Guide ...................................................................................................
691H
220
199H
15.1
Preparing the PTP 600 Series Bridge E1/T1 Cable............................................................
692H
220
200H
15.2
Making the Connection at the ODU ....................................................................................
693H
221
201H
15.3
Routing the Cable................................................................................................................
694H
224
202H
15.4
Fitting a Surge Arrestor .......................................................................................................
695H
224
203H
15.5
Customer Cable Termination ..............................................................................................
696H
224
204H
16
Lightning Protection .........................................................................................................
697H
227
205H
16.1
Overview .............................................................................................................................
698H
227
206H
16.2
Recommended Additional Components for E1/T1 Installation. ..........................................
699H
227
207H
16.3
Surge Arrestor Wiring..........................................................................................................
700H
230
208H
16.4
Testing Your Installation......................................................................................................
701H
232
209H
16.4.1
Pre-Power Testing...............................................................................................................
702H
232
210H
17
Data Rate Calculations .....................................................................................................
703H
234
211H
18
AES Encryption Upgrade .................................................................................................
704H
241
212H
18.1
Configuring Link Encryption ................................................................................................
705H
241
213H
18.2
Configuring Link Encryption ................................................................................................
706H
241
Содержание MOTOWI 4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 24: ...22 List of Equations 462HEquation 1 Path Loss 955H63 463HEquation 2 Link Loss 956H91 ...
Страница 113: ...111 8 3 3 Detailed Counters Page Figure 53 Detailed Counters Page ...
Страница 139: ...137 Figure 75 Spectrum Management as seen from the Master Figure 76 Spectrum Management as seen from the Slave ...
Страница 183: ...181 Figure 114 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 220: ...218 14 3 2 2 Confirm Settings and Reboot ODU Figure 135 Confirm TDD Synchronization Configuration Parameters ...
Страница 221: ...219 Figure 136 Disarm Following TDD Synchronization ...
Страница 227: ...225 Figure 142 Diagrammatically Showing the E1 T1 Connections ...
Страница 228: ...226 Figure 143 Two E1 T1 120 Ohms signal Balanced to PTP600 Interface ...
Страница 230: ...228 Figure 144 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 233: ...231 Figure 146 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 237: ...235 Figure 149 QPSK 0 63 Single Payload Figure 150 QPSK 0 87 Single Payload ...
Страница 238: ...236 Figure 151 16 QAM 0 63 Single Payload Figure 152 16 QAM 0 87 Single Payload ...
Страница 239: ...237 Figure 153 64 QAM 0 75 Single Payload Figure 154 64 QAM 0 92 Single Payload ...
Страница 240: ...238 Figure 155 256 QAM 0 81 Single Payload Figure 156 16 QAM 0 63 Dual Payload ...
Страница 241: ...239 Figure 157 16 QAM 0 87 Dual Payload Figure 158 64 QAM 0 75 Dual Payload ...
Страница 242: ...240 Figure 159 64 QAM 0 92 Dual Payload Figure 160 256 QAM 0 81 Dual Payload ...