Page 40
Pre-Power Setup Procedure.
The 'Pre-Power Procedure' does not require connection to the mains power supply so leave the
machine disconnected if the covers have been removed.
The Loading Table Assembly effectively consists of the Loading Table itself, the Feed System & the
Manifold Air Separation System which acts as the Fixed Sidelay for the initial alignment of the paper
and therefore must be square to the input rollers.
To allow for manufacturing tolerances, the squareness of the Loading Table Assembly is controlled
by the two M8 Button Head Screws which allow fore & aft adjustment of the operator side of the
Loading Table. (See FIG.1.5).
Use the following procedure to check & adjust the Loading Table squareness:-
Remove the Balls from the Sidelay.
Open the Input Roller gap fully by releasing the Locking Screw using a 4mm hexagon key to
move it down towards the Loading Table. (See FIG.1.2 below).
Place a Test Sheet on the Loading Table with its Lay Edge against the Fixed Side Lay & slide
it through the open Input Rollers until the lead edge just becomes visible.
Do not use damp, bent, buckled or damaged test sheets.
1.
Loading Table Alignment:-
1.1.
1.2.
1.3.
WARNING.
FIG.1.2
Operator Side
Locking Screw
CREASING / FOLDING
Содержание Digifold Pro CB
Страница 7: ...Page 7 SYSTEM BLANK PAGE Digifold Pro ...
Страница 13: ...Page 13 SYSTEM Digifold Pro ...
Страница 17: ...Page 17 SYSTEM BLANK PAGE Digifold Pro ...
Страница 21: ...Page 21 SYSTEM Layedge Side Operator Side Digifold Pro ...
Страница 37: ...SYSTEM Page 37 BLANK PAGE Digifold Pro ...
Страница 39: ...Page 39 SYSTEM Digifold Pro ...
Страница 53: ...Page 53 BLANK PAGE Digifold Pro SYSTEM ...
Страница 55: ...Page 55 Digifold Pro SYSTEM ...
Страница 61: ...Page 61 Digifold Pro SYSTEM ...
Страница 73: ...Page 73 Digifold Pro SYSTEM ...
Страница 79: ...Page 79 Digifold Pro SYSTEM ...
Страница 88: ...Page 88 CREASING FOLDING Section N BL YEL ...
Страница 92: ...Page 92 CREASING FOLDING Mod No Rev Mod Description Date Mod By REVISION HISTORY ...