Page 43
2.2.
2.3.
2.4.
2.5.
Remove the Balls from the Sidelay
Open the Input Roller gap fully by releasing the Locking Screw and using the 4mm
hexagon key to move it down towards the Loading Table. (See FIG.2.3 below).
Place a Test Sheet on the Loading Table with its Lay Edge against the Fixed Side Lay &
slide it through the open Input Rollers until the lead edge just enters the DynaCrease
Unit.
It should be possible to visually check the parallel alignment of the lead edge of the
sheet with the Upper Tie Bar of the DynaCrease Unit. (See FIG.2.5).
Do not use damaged test sheets.
WARNING.
FIG.2.3
Side Lay (Manifold)
Input Rollers
Paper
Dynacrease
Fixed
Tie Bar
FIG.2.5
Leading Edge of
Test Sheet
Operator Side
Locking Screw
Digifold Pro
SYSTEM
Содержание Digifold Pro CB
Страница 7: ...Page 7 SYSTEM BLANK PAGE Digifold Pro ...
Страница 13: ...Page 13 SYSTEM Digifold Pro ...
Страница 17: ...Page 17 SYSTEM BLANK PAGE Digifold Pro ...
Страница 21: ...Page 21 SYSTEM Layedge Side Operator Side Digifold Pro ...
Страница 37: ...SYSTEM Page 37 BLANK PAGE Digifold Pro ...
Страница 39: ...Page 39 SYSTEM Digifold Pro ...
Страница 53: ...Page 53 BLANK PAGE Digifold Pro SYSTEM ...
Страница 55: ...Page 55 Digifold Pro SYSTEM ...
Страница 61: ...Page 61 Digifold Pro SYSTEM ...
Страница 73: ...Page 73 Digifold Pro SYSTEM ...
Страница 79: ...Page 79 Digifold Pro SYSTEM ...
Страница 88: ...Page 88 CREASING FOLDING Section N BL YEL ...
Страница 92: ...Page 92 CREASING FOLDING Mod No Rev Mod Description Date Mod By REVISION HISTORY ...