
Chapter 6: Testing
82
MobileView PENTA Installation Manual
GPS testing
You can test the GPS subsystem using the MobileView PENTA Hardware
Monitor program. Information relevant to users and installers is limited.
Figure 61: GPS Tracking View
Real-time inputs
The most useful part of the MobileView PENTA Hardware Monitor program is the
real-time inputs screen (Figure 62 on page 83). This screen shows the status of
every user-controllable MobileView input, output, fan, fuse, and voltage level on
the DVR.
Содержание PENTA
Страница 1: ...PENTA Installation Manual UM TR 1210 ...
Страница 5: ...MobileView PENTA Installation Manual iii ...
Страница 6: ......
Страница 23: ...Chapter 2 Camera installation MobileView PENTA Installation Manual 17 ...
Страница 24: ...Chapter 2 Camera installation 18 MobileView PENTA Installation Manual ...
Страница 72: ......
Страница 92: ...Chapter 6 Testing 86 MobileView PENTA Installation Manual ...
Страница 105: ...Appendix A Checklists and worksheets MobileView PENTA Installation Manual 99 ...
Страница 106: ......
Страница 114: ......