6
PRE-OPERATIONAL PROCEDURES AND SETTINGS
6.6 Intelligent Function Module Switch Setting
6
- 20
1
O
VER
VIE
W
2
SYS
T
E
M
CO
NF
IG
U
R
A
T
IO
N
3
S
P
E
CIFICA
TI
ONS
4
MODB
US
(R)
S
TA
NDA
RD
FUN
C
TIO
N
S
5
FUNC
TI
ON
6
PR
E
-O
PER
A
T
ION
AL
P
R
OCED
URE
S A
ND
SE
TTINGS
7
P
A
RA
MET
E
R S
E
TTI
N
G
8
UTIL
ITY P
A
CK
AGE
(G
X Co
nf
ig
u
rat
o
r-M
B)
(2) Setting details
Details of switches 1 to 5 are shown below.
POINT
1. The settings made with the intelligent function module switches become
effective after power is switched OFF and then ON or after the programmable
controller CPU is reset.
Setting change during operation is not available.
2. When no intelligent function module switch setting has been made, the initial
values of each switch are used for operation.
3. If using the link operation function, set two channels to the same settings.
(Except for MODBUS device assignment parameter starting methods in the
transmission speed setting/transmission setting (switch 2, 4).)
Remark
For the operation method of GX Developer, refer to the following manual.
GX Developer Operating Manual
Table6.6 Intelligent function module switch
Switch No.
Description
Default
Reference
Switch 1
CH1
Mode setting
0000
H
Switch 2
Communication speed/transmission
setting
0700
H
Switch 3
CH2
Mode setting
0000
H
Switch 4
Communication speed/transmission
setting
0700
H
Switch 5
CH1,2 station No. setting
0000
H
Содержание QJ71MB91
Страница 1: ......
Страница 2: ......
Страница 366: ...App 14 Appendix 4 External Dimensions APPENDICES Memo ...
Страница 371: ......
Страница 372: ......