eGROSS pro-x
– eGROSS
MM137-004 - Operator Manual
25
2.3. eGROSS pro-x/eGROSS installation
Before switching on eGROSS pro-x/eGROSS (when coming from a storage chamber),
allow the instrument to reach operating environment conditions (at least half an hour).
This chapter describes installing procedure for the eGROSS pro-x/eGROSS units (the procedure is the same).
First, the eGROSS pro-x/eGROSS unit must be placed in its final position for use. The unit can be moved on
its 5 wheels.
Unscrew the four support feet until the five wheels raise off the ground. Therefore, make sure that the unit is
at level on the horizontal plane and it is slightly lean over the backside in order to facilitate the emptying of the
sink. Otherwise, fix the feet.
2.3.1. Parts to be assembled
Fixative loading pedal
Looking at the machine from the rear left side you will see the following connector:
Unit rear view, left side:
Take the connector on the "fixative loading" pedal (picture below left) and connect it to the connector shown
above after removing the cap (figure below right).
This connector is used for attaching the fixative loading panel.