UBC10.241, UBC10.241-N1
U
–
Series
24V, 10A, DC-UPS
May. 2008 / Rev. 1.1 DS-UBC10.241-EN
All parameters are specified at an input voltage of 24V, 10A output load, 25°C ambient and after a 5 minutes run-in time
unless otherwise noted. It is assumed that the input power source can deliver a sufficient output current.
www.pulspower.com Phone +49 89 9278 0 Germany
22/23
Example for calculating the service life and the required replacement cycle:
Parameters for the example:
A 5Ah battery with a design life of 3-5 years is used (e.g. Yuasa battery which is used for type UZB12.051)
The average ambient temperature is 30°C
One buffer event consumes approx. 25% of the achievable buffer time.
One buffer event per day
Calculation:
Ambient temperature influence:
According to Fig. 28-1 curve A, a 2 years service life can be expected for an ambient temperature of 30°C.
Number of discharging cycles: 2 years * 365 cycles = 730cycles in 2 years.
According to Fig. 28-2, curve C has to be used (only 25% of battery capacity is required). 730 cycles have only a
negligible influence in a battery degradation and can be ignored.
Result:
The battery shall be replaced after 2 years.
Please note that the battery degrading begins from the production date (check date code on the battery) which may
shorten the replacement intervals.
Fig. 28-1
Service life versus ambient
temperatures, typ *)
Fig. 28-2
Cell capacity degradation vs. discharging
cycles *)
20°C
10
30°C
35°C
40°C 45°C
8
6
4
2
Ambient Temperature
25°C
1
3
5
7
9
Service Life in Years
Design Life
of Battery
A:
3-5 Years
B:
6-9 Years
C:
10-12 Years
A
B
C
0
120%
100%
40%
20%
Number of Discharging Cycles
200
60%
80%
Cell Capacity
Depth of
discharge
A:
100%
B:
50%
C:
30%
400
600
800
1000 1200
A
B
C
*)
datasheet figures from battery manufacturer
28.2.
P
ARALLEL AND
S
ERIAL
U
SE
Do not use the DC-UPS in parallel to increase the output power. However, two units of the DC-UPS can be paralleled
for 1+1 redundancy to gain a higher system reliability.
Do not use batteries in parallel, since the battery quality test might create an error message.
Do not connect two or more units in series for higher output voltages.
Do not connect two or more units in a row to get longer hold-up times.
Содержание 4350006.71
Страница 1: ...thicknessCONTROL MTS 8201 LLT O Frame Non contact thickness measurement Operating Instructions ...
Страница 12: ...Page 12 Laser Safety thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 62: ...Page 62 Instruction Manual Software thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 64: ...Page 64 Pneumatic Plan thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 70: ...Page 70 Declaration of Incorporation thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 95: ...Operating Instructions scanCONTROL 29xx ...
Страница 99: ...scanCONTROL 29xx Appendix A 1 Accessories 60 A 1 1 Recommended Accessories 60 A 1 2 Optional Accessories 61 ...
Страница 100: ......
Страница 135: ...Page 41 Operation of the Sensor with a PC scanCONTROL 29xx Fig 24 Predefined measuring fields ...
Страница 193: ......
Страница 194: ......
Страница 229: ......