Use only allowed lubricants to connect flue gas pipes.
Make sure horizontal components have a 3% clearance from the boiler (3 cm by 1 meter in length), because condensed water
could otherwise accumulate in the flue gas pipe. Condensed water in the flue gas pipe may cause operational malfunction.
If the combustion air / flue gas outlet is routed through a ceiling that must have a fire resistance duration, the panel
through to the panel roof cladding must correspond to the fire rating of the ceiling.
•
Legend for the above flue gas examples
Pos.
Description
Code No.
1
Flue gas pipe with measuring nipple DN 160, PPS
96.00060-1785
2
PPS pipe DN 160x250 mm
PPS pipe DN 160x500 mm
PPS pipe DN 160x1000 mm
PPS pipe DN 160x2000 mm
96.00060-0740
96.00060-1705
96.00060-1710
96.00060-1720
3
PPS revised pipe DN 160
96.00060-1770
10
Inlet air screen
11
Fixed vent screen, rigid DN 160, Stainless steel
96.00060-1702
12
Chimney support DN 160, 87°, PPS
96.00060-1796
13
Spacer DN 160, total 2 m
96.00060-1713
14
Fixed chimney head cover, rigid, DN 160, Stainless steel
96.00060-1711
15
Flap valve
21
PPS pipe DN 125x250 mm
PPS pipe DN 125x500 mm
PPS pipe DN 125x1000 mm
PPS pipe DN 125x2000 mm
96.00060-0690
96.00060-1205
96.00060-1210
96.00060-1220
22
PPS pipe DN 125x500 mm with measuring nipple
96.00060-0691
23
PPS revised pipe DN 125
96.00060-1270
Table 5:
23
Содержание ProCon HT 150
Страница 1: ...1...
Страница 29: ......
Страница 62: ...7 Technical documentation ProCon HT 150 HT 225 7 9 Measurements and connection dimensions Fig 32 62...
Страница 74: ...Notes ProCon HT 150 HT 225 74...
Страница 75: ...HT 150 HT 225 GWB 75 Notes 75...
Страница 76: ...76...