ProCon HT 150 / HT 225
4. Hydraulic schemes
•
Electrical connections
Component
Connection to
Annotation
Outdoor sensor
OS terminal
HC pump
Terminal HC pump
Two-wire bus
Bus terminal
Bus connection between wall-mount enclosure and
boiler
Flow sensor MK 1
RVA 46.531
B3, M
Pump MK 1
RVA 46.531
Q2, N,
Mixer motor MK 1
RVA 46.531
Y1, Y2, N,
Flow sensor MK 2
RVA 63.280
B1, M
Pump MK 2
RVA 63.280
Q2, N,
Mixer motor MK 2
RVA 63.280
Y1, Y2, N,
Flow sensor MK 3
RVA 63.280
B12, M
Pump MK 3
RVA 63.280
Q6,
Mixer motor MK 3
RVA 63.280
Y5, Y6, N,
Domestic water sensor
RVA 63.280
B3, M
Domestic water charge pump
RVA 63.280
Q3, N,
•
Programming
Change default setting according to specification in the table.
Contro
ller
Line
Set point value
Annotation
80
0
No generator
85
1
Device address 1
86
1
Segment address 1
87
1
Unadjusted system time
RVA 46.531
95
00.01
Device address RVA 47
80
0
No generator
67
00.01
Device address RVA 47
140
2
Device address 1
141
1
Segment address 1
RVA 63.280
148
1
Unadjusted system time
To program the control units RVA 47 and RVA 63 follow the corresponding instruction manuals.
39
Содержание ProCon HT 150
Страница 1: ...1...
Страница 29: ......
Страница 62: ...7 Technical documentation ProCon HT 150 HT 225 7 9 Measurements and connection dimensions Fig 32 62...
Страница 74: ...Notes ProCon HT 150 HT 225 74...
Страница 75: ...HT 150 HT 225 GWB 75 Notes 75...
Страница 76: ...76...