ProCon HT 150 / HT 225
7. Technical documentation
•
Operation phase display (Display level A4)
You can show the operation phases corresponding to the sequence diagram LMU on AGU2.361 via display (12) by pressing the button (8) and
At the same time, you are specifying the following coordination between the display code and LMU…phase description:
Display
Meaning
Internal operation phases LMU...
00
Standby (no heat request)
PH_STANDBY
01
Anti-start up
PH_STARTVER
02
Fan run up
PH_THL1_1
PH_THL1_2
03
Pre-ventilation
PH_TV
04
Standby time
PH_TBRE
PH_TW1
PH_TW2
05
Pre-ignition time
PH_TVZ
06
Constant safety time
PH_TSA1_1
PH_TSA2_1
07
Variable safety time
PH_TSA1_2
PH_TSA2_2
10
Heating operation
PH_TI
PH_MODULATION
Heating operation
11
Domestic water operation
PH_TI
PH_MODULATION
Domestic water
operation
12
Parallel operation of heating and domestic water
PH_TI
PH_MODULATION
Heating and domestic water operation
20
Post-ventilation with final operation control
PH_THL2_1
PH_TN_1
21
Post-ventilation with pre-air control
PH_THL2_2
PH_TN_2
22
Return motion
PH_TNB
PH_TLO
PH_TNN
99
Error status (the current error code will be displayed )
PH_STOER
If the phases are very short or have been skipped, the corresponding display code will not appear.
53
Содержание ProCon HT 150
Страница 1: ...1...
Страница 29: ......
Страница 62: ...7 Technical documentation ProCon HT 150 HT 225 7 9 Measurements and connection dimensions Fig 32 62...
Страница 74: ...Notes ProCon HT 150 HT 225 74...
Страница 75: ...HT 150 HT 225 GWB 75 Notes 75...
Страница 76: ...76...