ProCon HT 150 / HT 225
2. Installation
2.7
Maximum pipe lengths, Flue gas systems for
ProCon HT 150 / HT 225
Flue gas outlet in a duct, connecting pipe 2 meters with 2x 87° - deflection
Room air dependent operation
mode
ProCon
Connecting pipe
Riser
max. Length [m] Duct size
HT 150
DN 160
DN 125 rigid
26 m
180 x 180 mm
HT 150
DN 160
DN 125 flexible
17 m
180 x 180 mm
HT 150
DN 160
DN 160 rigid
28 m
220 x 220 mm
HT 225
DN 160
DN 160 rigid
40 m
220 x 220 mm
Air supply from the boiler room
Room air independent operation
mode
ProCon
Connecting pipe
Riser
max. Length [m] Duct size
HT 150
DN 160
DN 125 rigid
27 m
220 x 220 mm
HT 150
DN 160
DN 160 rigid
40 m
220 x 220 mm
HT 225
DN 160
DN 160 rigid
23 m
220 x 220 mm
HT 225
DN 160
DN 160 rigid
40 m
260 x 260 mm
Air supply: Air intake can take place via the annular gap of the duct or through the outer wall.
Max. resistance of the air inlet pipe is 100 PA.
With additional deflections and a more than 2m long connecting pipe, the full installation length reduces. Each additional elbow reduces
the installation height by 1m respectively. The specifications are standard values and in borderline cases need to be calculated
according to EN 13384-1.
15
Содержание ProCon HT 150
Страница 1: ...1...
Страница 29: ......
Страница 62: ...7 Technical documentation ProCon HT 150 HT 225 7 9 Measurements and connection dimensions Fig 32 62...
Страница 74: ...Notes ProCon HT 150 HT 225 74...
Страница 75: ...HT 150 HT 225 GWB 75 Notes 75...
Страница 76: ...76...