Report on the first start-up of the boiler
(Copy of the owner of the central heating boiler)
In order to verify the purchase and recognise the validity of the guarantee, a report must be sent within 30 days
from the date of first use. This can be done by:
1.
E-mail - in which a scan or photo of the report will be included.
2.
Letter - in which a copy of the report will be sent to the company METAL-FACH Jacek Kucharewicz, the
address of the company can be found at the end of the Technical and Operational Document.
3.
Boiler house
Fulfils
Does not meet
Comment
The conditions included in DTR in chapter "Requirements
concerning the boiler room and boiler installation" are
observed.
Conditions included in DTR in chapter "Connecting the boiler
to chimney" are complied with.
Central heating system
Fulfils
Does not meet
Comment
Conditions included in DTR in chapter " Connecting boiler to
heating system" are fulfilled.
The conditions included in DTR in chapter "Requirements
concerning the expansion vessel" are observed.
There is no other heating source. If there is, does it affect the
boiler operation and how?
Protection of the system against freezing.
Connection of elements with electrical installation
Fulfils
Does not meet
Comment
The conditions included in DTR in chapter "Connecting boiler
with electrical installation" are observed.
Test of accessories
Fulfils
Does not meet
Comment
The sensors are located in the right place.
Sensor readings are in accordance with the actual status.
The direction of rotation of the fan is correct.
Opening of the fan flap using the blowing force.
The direction of rotation of the worm is correct.
Boiler start-up
Fulfils
Does not meet
Comment
The tightness of the hydraulic connection of the boiler to the
installation is maintained.
Test of the STRAKE system (if installed).
Check the connection of the fuel feeder to the boiler.
Fill the fuel tank with fuel.
Check fuel feeding by the feeder.
Содержание SEG BIO
Страница 1: ......
Страница 2: ......
Страница 46: ...METAL FACH Heating Technology 44 ...
Страница 52: ...METAL FACH Heating Technology 50 ...
Страница 54: ...METAL FACH Heating Technology 52 ...
Страница 56: ...METAL FACH Heating Technology 54 ...
Страница 63: ......
Страница 64: ......