2.

 

Boiler houses with a heat output of more than 25 kW shall additionally meet the following requirements: 

 

the distance of the boiler furthest from the chimney, with gravitational draught, must not exceed 50 cm 

of the chimney height; 

 

fuel storage and slag storage should be located next to the boiler hall at a storage height of up to 220 cm 

with a free space above the fuel of at least 50 cm; 

 

facilities and equipment should be provided for the vertical and horizontal transport of fuel and cinders; 

 

the fuel storage room should be ventilated in a natural unforced manner allowing for one full air change 

per hour in the fuel storage room and three full air changes in the slag storage room; 

 

the entrance door to the boiler room shall be non-combustible (class 0.5 fire resistance), minimum width 

80 cm, opening outwards; it shall have a handleless locking system enabling the door to be opened 

outwards under pressure and inwards using a handle; 

 

ventilation requirements are the same as for boiler rooms of smaller capacity; additionally, in boiler 

rooms whose capacity exceeds 400 kW, in addition to supply and exhaust ventilation, there should be 

mechanical ventilation, periodically activated when filling in fuel and slagging the boilers, ensuring a 

minimum of 10 full air changes per hour; 

 

natural lighting should be provided in the boiler room, illuminating the boiler from the front, and the 

window area should be at least 1/15 of the boiler room floor area; half of the installed windows should 

be openable; electric lighting and an electric socket with a voltage not exceeding 24 V should also be 

located in the room; 

 

there should be a drainage sump in the floor to allow water cooling, and its capacity should be equal to 

the water capacity of the largest boiler, but not more than 2 m

3

 

in the boiler room, thermal pipes should be insulated; 

 

boiler location with minimum required distances is shown in the boiler room diagram below. 

 

 

ATTENTION! 

Mechanical exhaust ventilation should not be used in a boiler room. 

 

 

 

 

ATTENTION! 

Ensuring a sufficient supply of fresh air into the boiler room will enable efficient 

combustion of the fuel. 

 

 

 

Содержание SEG BIO

Страница 1: ......

Страница 2: ......

Страница 3: ...nnection to a closed heating system 24 Requirements for the expansion vessel 27 Boiler connection to the electrical installation 28 Connecting the boiler to the chimney 31 Commissioning the boiler 32 Suggested boiler output settings 39 When using the boiler remember 40 Cleaning and maintenance of the boiler 41 Instructions for disposal of the boiler at the end of its service life 41 Spare parts li...

Страница 4: ... used in the manual NOTE Very important information always read it if it is present TIP It is worth familiarising yourself with this information it makes handling easier Definitions of terms used in the manual User Installer Central heating boiler a device for burning various types of solid fuels to heat the heat carrier usually water circulating in the central heating cycle Burner is a technical ...

Страница 5: ...oiler casing on the left or right side with your order carefully read this manual it contains information which you need to use the boiler correctly In case of any problems please contact the service department or METAL FACH Jacek Kucharewicz authorized service These persons have appropriate training and access to original parts which enable the proper performance of service and installation of bo...

Страница 6: ...ions concerning the appliance contained in this Technical and Operating Documentation in the Warranty Conditions and in the generally applicable legal provisions The boilers are delivered in an assembled condition They are set up and fixed permanently to a pallet Additional protection in the form of foil packaging is used When transporting the boiler it is necessary to secure it against shifting o...

Страница 7: ... BIO reaches efficiency of 90 Correct operation and achieving the full capacity of the boiler depend on the quality of the installation appropriate chimney draught correct operation and maintenance of the boiler ATTENTION The boilers are intended for operation in open and closed water systems with gravity or forced circulation with safeguards in accordance with the requirements of the current stan...

Страница 8: ...n pieces 1 Fuel feeding system with burner set 1 Fuel tank pieces 1 Tools for cleaning the boiler poker brush pieces 1 STRAŻAK extinguishing system pieces 1 Feet for boiler levelling in SEG BIO 15 40 kW boilers pieces 4 Additional equipment Unit of measurement Quantity LAMBDA SONDA module pieces 1 Documentation Unit of measurement Quantity Boiler technical and operating documentation pieces 1 Oper...

Страница 9: ...ments of boiler construction User Installer The water body is made as a welded structure from approved steel sheets 5 mm thick P265GH for elements in contact with exhaust gases and 4 mm thick S235JR N for other elements Boiler SEG BIO 15 40kW ...

Страница 10: ...METAL FACH Heating Technology 8 Boiler SEG BIO 50 75kW longitudinal section Kocioł SEG BIO 50 kW Boiier SEG BIO 75 kW ...

Страница 11: ...5 Flue 16 Upper cleanout cover 17 Ashtray hatch 18 Cooling coil optional 19 STB sensor sleeve 20 Boiler temperature sensor sleeve 21 Bushing for flue gas temperature sensor 22 Lambda probe bush 23 Valve stub VST 212 24 Fan 25 Bushing for Feeder temp sensor 26 Ash drawer 27 Deflector 28 Valve I 29 Valve train II 30 Boiler regulator 31 Lambda probe 32 Flue gas temperature sensor 33 Lambda probe modu...

Страница 12: ...0 Fuel tank capacity L 190 290 350 Fuel Wood pellets of class C in accordance with pt 5 3 Table 7 of PN EN 303 5 2012 standard diameter 6 1 mm 8 1mm length 3 15 L 40 moisture content 12 ash content 0 5 calorific value 17 MJ kg Electrical connection 5A 230V 50Hz Electric power consumption W 300 300 300 Electric power consumption momentary at start up W 1000 1000 1000 Setting range of temperature re...

Страница 13: ... Fuel tank capacity L 350 400 520 Fuel Wood pellets of class C in accordance with pt 5 3 Table 7 of PN EN 303 5 2012 standard diameter 6 1 mm 8 1mm length 3 15 L 40 moisture content 12 ash content 0 5 calorific value 17 MJ kg Electrical connection 5A 230V 50Hz Electric power consumption W 300 400 400 Electric power consumption momentary at start up W 1000 1000 1000 Setting range of temperature reg...

Страница 14: ...METAL FACH Heating Technology 12 Boiler dimensions User Installer ATTENTION Boiler feet are available from SEG BIO 15 to SEG BIO 40 Their height is 30 mm ...

Страница 15: ...175 E 910 1105 1160 1160 1110 1115 F 350 360 410 410 535 545 G 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 H 3 4 3 4 3 4 3 4 3 4 3 4 I 180 180 180 180 220 220 J 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 K 213 247 245 245 337 350 L 213 207 205 205 190 175 M 680 680 680 680 680 680 N 707 720 776 766 850 1075 O 125 125 125 125 175 220 P 870 905 955 955 1218 1413 R S T Dimension does not include the height of the b...

Страница 16: ...uel eliminating to a large extent creation of impurities and soot in the boiler high stabilisation of boiler operation temperature eliminates water vapour condensation in the boiler combustion chamber temperature is high and stable thus reducing carbon monoxide emissions 4 Lambda probe The lambda probe continuously adjusts the amount of supplied air in order to ensure the best possible operation o...

Страница 17: ...e of non flammable materials protruding 0 05 m above the floor level and edged with steel angles there should be artificial lighting in the room and natural lighting is recommended the distance from the back of the boiler to the wall should not be less than 70 cm from the side of the boiler to the wall not less than 100 cm and from the front of the boiler to the opposite wall not less than 200 cm ...

Страница 18: ...tilation requirements are the same as for boiler rooms of smaller capacity additionally in boiler rooms whose capacity exceeds 400 kW in addition to supply and exhaust ventilation there should be mechanical ventilation periodically activated when filling in fuel and slagging the boilers ensuring a minimum of 10 full air changes per hour natural lighting should be provided in the boiler room illumi...

Страница 19: ...rbon dioxide formation in the room ATTENTION More detailed information on the requirements for the construction of a boiler house can be found in the Regulation of the Minister of Infrastructure of 12 March 2009 NOTE The above mentioned provisions are guidelines which should be reviewed as the regulation is subject to revision ...

Страница 20: ...to level the boiler with the ground If the boiler is in a horizontal position the installation of the feet is not required 3 If the boiler is in a horizontal position the installation of the feet is not necessary 4 Use a spirit level to align the boiler Installation of the boiler levelling feet 1 Adjustment foot pcs 4 2 Nut M10 pcs 8 3 Washer Ø10 pcs 8 ATTENTION An improperly leveled boiler can be...

Страница 21: ...insulation C1 Sparingly combustible Beech wood oak wood plywood C2 Moderately flammable Pine larch and spruce wood cork sawn timber boards rubber floor coverings C3 Easily burning Asphalt plywood celluloid polyurethane polystyrene polyethylene plastic PVC Boiler connection to the heating system Installer Boiler connection to the central heating system should be performed by a firm authorized by th...

Страница 22: ...nology 20 Boiler connection diagrams to the heating system in accordance with DIN 91 B 02420 Designation Description RO Vent pipe RW Expansion pipe RS Signalling pipe RP Overflow pipe RB Safety pipe T1 Temperature P1 Pressure ...

Страница 23: ...nology 21 Boiler connection diagrams to the heating system in accordance with DIN 91 B 02420 Designation Description RO Vent pipe RW Expansion pipe RS Signalling pipe RP Overflow pipe RB Safety pipe T1 Temperature P1 Pressure ...

Страница 24: ...C O 9 Domestic hot water pump DHW 10 Circulation pump 11 Additional pump P3 12 Buffer tank 13 Laddomat 14 Heating circuit pumps 1 2 3 4 15 Thermostatic mixing valve Designation Description T Temperature sensor Tk Boiler temperature sensor Tz Outdoor temperature sensor Tcw Domestic hot water temperature sensor Tco Central heating temperature sensor Tpw Boiler return temperature sensor Tpod Feeder t...

Страница 25: ...ting pump C O 9 Domestic hot water pump DHW 10 Circulation pump 11 Additional pump P3 12 Buffer tank 13 Laddomat 14 Heating circuit pumps 1 2 3 4 15 Thermostatic mixing valve Designation Description T Temperature sensor Tk Boiler temperature sensor Tz Outdoor temperature sensor Tcw Domestic hot water temperature sensor Tco Central heating temperature sensor Tpw Boiler return temperature sensor Tpo...

Страница 26: ...n buildings and PN EN 303 5 2012 Solid fuel heating boilers with manual and automatic fuel loading Part of Description STB Safety temperature limiter with manual return to home position Cooling coil Cools the installation when the temperature exceeds 97 o C VST 112 valve Protects against backfire into the solid fuel feeder by flooding the fuel in the event of excessive temperature rise Pressure ex...

Страница 27: ...ated cooling coil and thermal protection In solutions with a safety coil built into the boiler for example thermal protection is used Solid fuel boilers with automatic fuel feed do not pose a significant risk of uncontrolled temperature rise in the central heating system as the amount of fuel fed to the burner is small Moreover in the event of a temperature rise safety devices and actions are auto...

Страница 28: ... of boilers of the SEG BIO series the danger of fire entering the fuel tank is small and is counteracted by a tight construction of the fuel feeder protected by a limit switch ATTENTION The gas pressure in the expansion vessel should be checked and adjusted before using the boiler The expansion vessel should be checked once a year ATTENTION Install the safety valve at or near the heat source e g o...

Страница 29: ... associated venting The diameter of the vent pipe and overflow pipe shall be at least mm boiler performance kW The most important requirements for safety devices are as follows the expansion vessel should have a volume of approximately 3 5 of the volume of water contained in the heating system including the boiler each boiler should absolutely have a safety pipe and an overflow pipe the system sho...

Страница 30: ...ion of the installation and the heating test must be recorded in the Warranty Card The completed Guarantee Card should be sent to the address of the manufacturer by the user in order to register the user in the company s system ATTENTION The first start up of the boiler must be carried out only by a service technician trained by the manufacturer with a valid certificate of METAL FACH Authorised Se...

Страница 31: ...xer circuit type CT4 BH upper temperature sensor of buffer type CT4 BL bottom temperature sensor of buffer type CT4 OS optical flame brightness sensor WS weather temperature sensor type CT6 P FT flue gas temperature sensor type CT2S RT universal mixer thermostat No Nc ED ecoDRIVE module module controlling the grate servo DS input for fuel tank opening sensor or door L N PE mains supply 230V GR gro...

Страница 32: ...CT4 RM3 room thermostat for mixer 3 RM4 room thermostat for mixer 4 FS fuel level sensor for BU feeder operation H2 voltage input to control the reserve boiler or to signal alarms or for the domestic hot water circulation pump RELAY relay L N PE mains supply 230V PM 3 4 3 4 mixer pump SM 3 4 3 4 mixer servo BU fuel feeder from the bunker to the tank in boiler CPU control system A ecoMAX 860P2 T re...

Страница 33: ...ys are calculated according to the binding norm Low outlet flue gas temperature at nominal boiler output can cause emission of damp flue gases soot deposition insufficient chimney draught This can lead to dampness and corrosion of brick chimneys It is recommended to use a chimney insert in new buildings a ceramic flue system resistant to condensation thermally insulated and with a condenser is rec...

Страница 34: ...chamber the bottom one with a built in hearth First start up of the boiler checking the connections Before the first start up of the boiler check all the screw connections and tighten them if there is any looseness If the boiler was disassembled to bring it to the boiler room remember to properly seal the boiler frame burner interface high temperature silicone The next step is to connect all elect...

Страница 35: ...power switch under the switch there is an 8 2A fuse Turning the boiler on In order to turn the boiler on press the red button in the I position as it is shown on the picture above If the above actions have been performed correctly the display will start as shown on the adjacent picture The main menu is visible on the picture beside The controller has a touch screen and can be operated with a finge...

Страница 36: ... the instructions we will see the menu as in the diagrams opposite Boiler start up A boiler needs a dose of fuel in order to work When dealing with a new boiler the first thing we do is to pour the appropriate type of fuel into the hopper The feeder in boilers is of the worm type the worm is responsible for transporting the fuel to the burner For a smooth start up it is first necessary to feed a s...

Страница 37: ...ACH Heating Technology 35 Trough burner The picture beside shows an empty feeder no starting dose of fuel When the feeder is switched to ON in the Manual operation menu the fuel starts to appear on the burner ...

Страница 38: ...boiler on To activate the boiler controller return to the main menu The next step is to press the red button to start the controller If everything has been done correctly in the upper left corner instead of the word OFF you will see the word FIRING ...

Страница 39: ... the message Failed firing up will appear The operation of the igniter is illustrated by the flame shown in the photo Boiler is considered to be heated up when the flue gas temperature exceeds the boiler temperature by 10 degrees In the picture on the right we can see that the flue gas temperature is not higher than the boiler temperature by 10 degrees therefore the boiler operates in the FIRING U...

Страница 40: ...t up of the boiler after replacement of the overload clutch fuse remove carbon from the burner turn the worm clockwise and counterclockwise then check if there is no foreign matter inside e g a stone or a rod if there is pull it out and replace the pin pour fuel into the tank set the OFF mode on the control panel feed fuel to the burner with the manual fuel feed function TEST mode feed fuel until ...

Страница 41: ...ding in cycle ON 22 25 29 31 43 53 58 28 42 56 53 70 Pre feed 25 25 25 25 25 25 25 15 15 15 15 15 Ignition 0 0 0 0 0 0 0 0 0 0 0 0 Blower igniter 3 3 3 3 3 3 3 3 3 4 4 4 Fire test 3 3 3 3 3 3 3 2 3 3 2 2 Starting power 60 60 60 60 60 60 60 60 60 60 60 60 Afterburning 2 2 2 2 2 2 2 2 2 2 2 2 Boiler capacity kW 14 16 19 20 28 34 38 50 75 100 150 200 Blower 100 12 12 12 12 12 15 15 15 20 25 70 5 Blow...

Страница 42: ...l it down Do not overheat the boiler in any way during its operation Do not put flammable objects on the boiler or in its close vicinity When removing the ashes flammable materials must not be located in the distance less than 150 cm from the boiler Put the ashes into heat resistant vessels with a lid When the boiler operates at a temperature lower than 60 C the steel exchanger can dampen and corr...

Страница 43: ...al boiler standstill preferably every 100 hours of boiler operation Thorough cleaning of the boiler should be done once a month Instructions for disposal of the boiler at the end of its service life User Before scrapping the boiler all electronic components must be disconnected from the boiler They must be disposed of in accordance with the European Directive 2002 96 EC concerning the disposal of ...

Страница 44: ...OLD PLATINUM STB thermal protection Igniter Igniter 700W Probe Lambda probe kit Lambda probe sleeve Fans Fan RMS 108 Fan RMS 120 Feeder Gearmotor with a 1 rpm motor Feeder motor 0 09kW Feeder screw 800mm Burner safety pin M5x60 class 5 8 Tooling Capillary tube for exhaust sensor Electrical harness Socket for fan feeder igniter Rubber grommet Power switch Socket for fuse Fuse Interface relay Gasket...

Страница 45: ...lling for service please read the following frequently asked questions Online application www metalfachtg com pl zglos problem online Hotline 48 85 711 94 54 ext 17 Instructional videos www youtube com c METALFACHTechnikaGrzewcza FAQ www metalfachtg com pl kontakt z serwisem faq ...

Страница 46: ...METAL FACH Heating Technology 44 ...

Страница 47: ...s the Guarantor Jacek Kucharewicz operating under the business name Metal Fach Jacek Kucharewicz 16 100 Sokółka 66 Sikorskiego Street Tax Identification Number NIP 545 100 10 62 Business Identification Number REGON 050073833 phone 48 85 711 94 56 3 Under the guarantee the user has the right to repair the device free of charge if the defects of the device become apparent during the guarantee period...

Страница 48: ...ions of the appliance in accordance with the guidelines included in the technical and operating documentation should be carried out by specialised companies with appropriate authorisation a sample list of specialised companies is available from the Manufacturer under 48 85 711 94 56 and their performance should be recorded in the guarantee card Inspection of the device is a chargeable service 7 Ma...

Страница 49: ... the Guarantor www metalfachtg pl zglos problem online or infoline 48 85 711 94 56 3 The user is advised to refrain from using the faulty device 4 The user is obliged to ensure free access to the device in particular to remove the housing of the device access to the valves 5 Repairs under the guarantee will be performed by the Guarantor or a specialist company indicated by the Guarantor 6 The obli...

Страница 50: ...METAL FACH Heating Technology 48 Confirmation of inspection warranty repair maintenance service L p Date of execution Description of work carried out Signature and stamp of the contractor 1 2 3 4 5 6 7 ...

Страница 51: ...METAL FACH Heating Technology 49 L p Date of execution Description of work carried out Signature and stamp of the contractor 8 9 10 11 12 13 14 ...

Страница 52: ...METAL FACH Heating Technology 50 ...

Страница 53: ...nal power up to 500 kW 2 PN EN ISO 12100 2012 Safety of machinery Basic concepts general principles for design Part 1 Basic terminology methodology 3 PN EN 1708 1 2010 Welding Basic solutions for welded steel joints Part 1 Pressure parts 4 PN EN ISO 9606 1 2014 02 Welding Examination of welders Steels 5 PN EN 60335 1 2012 Household and similar electrical appliances Safety Part 1 General requiremen...

Страница 54: ...METAL FACH Heating Technology 52 ...

Страница 55: ...ained in the warranty conditions in accordance with the Act of 29 August 1997 on personal data protection consolidated text Journal of Laws 2014 item 1182 The user has the right to access the content of his personal data to correct them to request the cessation of data processing and to object to the processing of data in cases indicated by law Any correspondence relating to the processing of pers...

Страница 56: ...METAL FACH Heating Technology 54 ...

Страница 57: ... unjustified calling of the service team or failure to meet points 1 or 2 each commenced hour of the service technician s work 70 PLN net travel 1 PLN net km in both directions 4 The legible signature of the applicant confirms the acquaintance with the basic conditions of the complaint procedure Legible signature of the complainant Signature of the person receiving the complaint I declare that I a...

Страница 58: ... Journal of Laws 2014 item 1182 The user has the right to access the content of his personal data to correct them to request the cessation of data processing and to object to the processing of data in cases indicated by law Any correspondence relating to the processing of personal data shall be directed to the address Metal Fach Jacek Kucharewicz 16 100 Sokółka 66 Sikorskiego St Providing personal...

Страница 59: ...n DTR in chapter Connecting boiler to heating system are fulfilled The conditions included in DTR in chapter Requirements concerning the expansion vessel are observed There is no other heating source If there is does it affect the boiler operation and how Protection of the system against freezing Connection of elements with electrical installation Fulfils Does not meet Comment The conditions inclu...

Страница 60: ...data provided in this form shall be processed by Jacek Kucharewicz conducting business activity under the name Metal Fach Jacek Kucharewicz 16 100 Sokółka ul Sikorskiego 66 NIP 545 100 10 62 telephone 48 85 711 94 56 for the purpose of implementing the provisions contained in the warranty conditions in accordance with the Act of 29 August 1997 on personal data protection consolidated text Journal ...

Страница 61: ...TR in chapter Connecting boiler to heating system are fulfilled The conditions included in DTR in chapter Requirements concerning the expansion vessel are observed There is no other heating source If there is does it affect the boiler operation and how Protection of the system against freezing Connection of elements with electrical installation Fulfils Does not meet Comment The conditions included...

Страница 62: ...data provided in this form shall be processed by Jacek Kucharewicz conducting business activity under the name Metal Fach Jacek Kucharewicz 16 100 Sokółka ul Sikorskiego 66 NIP 545 100 10 62 telephone 48 85 711 94 56 for the purpose of implementing the provisions contained in the warranty conditions in accordance with the Act of 29 August 1997 on personal data protection consolidated text Journal ...