An important element of installation is the correct positioning and levelling of the SEG BIO type boiler; these
boilers do not require special foundations. Boiler leveling is facilitated by adjustable feet. The boiler must stand
vertically.
1.
Check if there are four feet in the set.
2.
Use a spirit level to level the boiler with the ground. If the boiler is in a horizontal position, the
installation of the feet is not required.
3.
If the boiler is in a horizontal position, the installation of the feet is not necessary.
4.
Use a spirit level to align the boiler
Installation of the boiler levelling feet
1.
Adjustment foot, pcs. 4
2.
Nut M10, pcs. 8
3.
W
asher Ø10, pcs.
8
ATTENTION!
An improperly leveled boiler can be damaged.
ATTENTION!
It is not permissible to place the boiler in a damp or wet room, as this accelerates
corrosion, leading in a short time to the destruction of the boiler.
Содержание SEG BIO
Страница 1: ......
Страница 2: ......
Страница 46: ...METAL FACH Heating Technology 44 ...
Страница 52: ...METAL FACH Heating Technology 50 ...
Страница 54: ...METAL FACH Heating Technology 52 ...
Страница 56: ...METAL FACH Heating Technology 54 ...
Страница 63: ......
Страница 64: ......