Boiler connection to the electrical installation
(Installer)
The boiler is designed for connection to 230V/50Hz. The installation should be carried out by a qualified person.
The connection socket 230V/10A with earthing should be easily accessible. Boiler power supply and boiler room
lighting should have a different circuit.
The completion of the installation and the heating test must be recorded in the Warranty Card. The completed
Guarantee Card should be sent to the address of the manufacturer by the user in order to register the user in
the company's system.
ATTENTION!
The first start-up of the boiler must be carried out only by a service technician trained by
the manufacturer, with a valid certificate of METAL-FACH Authorised Service Provider,
METAL-FACH Distributor or a person holding an SEP license up to 1,5 kW.
ATTENTION!
All pumps, mixer, relay, igniter, etc. are not supplied with the controller.
Содержание SEG BIO
Страница 1: ......
Страница 2: ......
Страница 46: ...METAL FACH Heating Technology 44 ...
Страница 52: ...METAL FACH Heating Technology 50 ...
Страница 54: ...METAL FACH Heating Technology 52 ...
Страница 56: ...METAL FACH Heating Technology 54 ...
Страница 63: ......
Страница 64: ......