BAM 1020-9800 Manual Rev W.docx
Page 15
BX-802
PM
10
Head
BX-806, BX-
807, BX-808
or BX-809
PM
2.5
Cyclone
BX-596
AT/BP Sensor
(or BX-592)
Inlet Support
Struts
8112
Inlet Tube
8’ standard
BX-801
Roof Flange
Enclosure
Roof
BX-827 or 830
Smart Heater
with insulation
Mounting
Bench or Rack
2”
2 Meters
6.5 feet
adds
14.0”
adds
19.0”
BAM-1020
With Medo
vacuum pump or
equivalent
8” min. clearance
3 to 4 feet typical
5’ typical
BAM 1020
MET ONE INSTRUMENTS
Typical BAM-1020 Installation in a walk-in shelter
Pipe Insulation
(recommended)