GASOLINE STERNDRIVE INSTALLATION MANUAL
90-860172011
Page 39 of 137
Driveshaft Extension Models
If your power package is equipped with a driveshaft extension, refer to the Driveshaft
Extension Installation Instructions included with your engine package.
Engine Preparation
1. Remove and read all tags attached to engine.
2. Remove the plug from the engine coupler.
3. Remove all hardware that secures engine to shipping container.
4. Connect battery cables to engine. Be sure to observe the following:
a. Make sure that grounding stud and starter solenoid terminal are free of paint or any
other material that could cause a poor electrical connection.
b. After battery cables are connected, apply a thin coat of sealant to the terminals.
Description
Where Used
Part Number
A
Liquid Neoprene
Battery Terminals
92-25711-2
c. Be sure to slide rubber boot over positive (+) terminal after making connection.
5. Drape battery cables over top of engine to prevent interference during installation.
IMPORTANT: There is a fuse located at the starter solenoid. DO NOT remove this fuse.
The positive battery cable must be connected to the same stud as the fuse.
74907
b
c
d
a
a -
Positive (+) Battery Cable
b -
Starter Solenoid
c -
90 Amp Fuse - DO NOT Remove
d -
Rubber Boot Location
6. Remove shipping plug from coupler and lubricate splines.
Description
Where Used
Part Number
A
Engine Coupler Spline Grease
Coupler Splines
92-816391A4
7. Install quick oil drain hose plug in oil drain hose.
8. Install the fuel inlet fitting.