10. Loosen the needle clamp screw on the
needle bar as shown in Figure 5-25.
11. Slide the needle bar up or down until
1/2 of the needle’s eye is visible in the
bobbin cavity. Do not twist the needle
bar.
12. Retighten the needle clamp screw.
Make sure the needle bar is still in the
correct position.
13. Go to the "Hook Timing" position by
pressing [ALT][
⇒
]. The LCD displays:
HOOK TIMING.
14. Press [
⇒
] 8 times. The LCD displays: 10
STEPS FORWARD each time the key is
pressed.
15. Loosen the black screw on the
upper-dead-stop clamp. See Figure
5-25.
16. Press [
⇒
] one more time. This rotates
the embroidery head to the full needle
up position.
17. Slide the clamp up firmly against the upper stop and tighten the screw on the upper-dead-stop
clamp. Make certain the screw points straight outward.
18. Press [ALT][
⇑
]. The embroidery head rotates to Headup.
Upper Dead Stop
Clamp Screw
Needle Clamp
Screw
Figure 5-25
5 - 18
Head Timing
Advantage 18 Operation Manual
Melco Embroidery Systems
Содержание Advantage 18
Страница 6: ...Table of Contents Operation Manual iv Advantage 18 ...
Страница 14: ...1 8 Start Up Messages Advantage 18 Operation Manual Melco Embroidery Systems ...
Страница 92: ...C 2 Advantage 18 Operation Manual Melco Embroidery Systems ...
Страница 94: ...Advantage 18 Operation Manual Melco Embroidery Systems ...
Страница 96: ...Quick Reference Guide for Advantage 18 Part Number 110265 01 Rev A ...