29
Step
Description
6
Detach the LV HRC fuse replacement handle.
7
After the measurement, disconnect by reversing this sequence of steps.
If a longer line is required, one of the normal measuring cables can be used as an
extension. For this, the front part of the alligator clip on the measuring cable must be
exchanged for the screw-on adapter supplied with the MK 55. The existing fuse
must continue to be used.
7.2.2.2 Connection to Capacitive Test Points
The PVS 100i probe must only be directly connected to interfaces in accordance to
IEC
61243-5 Type LRM
.
In combination with the „HR->LRM“ adapter it is also allowed to be connected to
interfaces according to
IEC 61243-5 Type HR
.
It is absolutely essential to observe the correct polarity.
HR interface
(IEC 61234)
LRM interface
(IEC 61234)
Содержание PVS 100i
Страница 1: ...Issue 4 12 2016 EN Article number 84534 USER GUIDE PVS 100i Phase Verification System...
Страница 5: ...5...
Страница 46: ......