22
6
Commissioning the Base station
Preparation Generally, it is sufficient to fixedly install one base station within a network. To do so, a
suitable location should be selected where the device can be set up permanently and
that way stay connected to the same socket (phase).
Electrical connection The base needs to be connected to a socket belonging to the power grid under
investigation using the supplied power cord (NKG1). The supply voltage serves as
reference voltage.
Thanks to the offset compensation feature (see section 8)
knowledge of the reference
phase is not mandatory
.
The power socket should no longer be changed once the base station has been put into
operation and the measurement profiles have been created. If connected to a different
phase, the measurement profiles would lose their validity.
Configuring the
device
Before a device can be put into operation as a base station, the device settings under
Configuration
Settings
must first be opened and if necessary adjusted:
Parameter Description
Mode
Defines the mode the device operates in.
Because the basic hardware and software are the same, any device
in a PVS 100i system can be used as base station or mobile unit.
For the base station, the
Base
option has to be selected.
Language
Selection of the menu language.
Connection quality Once you have connected the base station and started it up, check that GPS and GSM
reception exist. If not, take action to improve the reception quality (see section 5.4).