
Chapter 5
Maintenance
Page 5-10
MAN 0318
ill 8744
Maintenance schedule
The following maintenance schedule should be followed to ensure the accessory
continues to correctly function.
Procedure
Period
Priming the system.
Every morning or at the beginning of a new
measurement session.
pH probe calibration.
Preferably before each titration session.
pH probe cleaning.
Once a week or according to in-house QC
procedures.
Cleaning the covers.
Once a month.
Dispensing syringe and o-ring
replacement.
The three dispensing syringes should be
replaced every 12 months.
pH probe replacement.
The pH probe should be replaced at least
every 12 months.
Screw-fit connection
“Luer” connection
MAN0318-4.0 - MPT-2 Autotitrator-Degasser.book Page 10 Tuesday, September 4, 2012 12:15 PM
Содержание MPT-2
Страница 2: ......
Страница 3: ...MPT 2 Degasser User Manual MAN0318 Issue 4 0 September 2012...
Страница 84: ......