HEADER OPERATION – R SERIES
Form # 169017
102
Issue – June 2008
HYDRAULIC LINK – M200 STD, M150 OPTION
1. Activate header tilt cylinder switches on GSL
to position center link cylinder (G) so that it
can connect to header.
2. Push down on rod end of link cylinder until
hook engages pin (H) on header and is
locked.
NOTE
If optional centerlink self-alignment kit
system is installed, activate link lift
cylinder from in the cab to lower center
link onto header.
e. Raise the header fully with the header up switch
on the GSL. Stop engine and remove key.
DANGER
To avoid bodily injury from fall of raised
header, always engage header lift cylinder
stops when working on or around raised
header.
f. Engage lift cylinder stops on both lift cylinders.
g. Install pin (A) through each boot and foot and
secure with hairpin.
IMPORTANT
Ensure pin (A) is fully inserted and hairpin
is installed behind bracket.
h. Remove pin (J) from storage position in linkage
and insert in hole (K) to engage float springs.
Secure with hairpin.
i. Disengage lift cylinder stops.
j. Start engine, and activate header lift cylinder
switch on GSL to lower header fully. Stop
engine and remove key.
k. Connect header drive hydraulics (L) and
electrical harness (M) to header. Refer to R80
Header Operator’s Manual.
A
G
H
K
J
L
M