MM102225V1, Rev. B
42
5.0 EQUIPMENT
CONFIGURATION
The objective of this procedure is to verify that base station equipment has been correctly
programmed for the site at which it is installed. Testing involves connecting a laptop
computer to each piece of equipment and interrogating and recording configuration files.
A record of the configuration files
will
be shipped with the radio rack. Compare the
pertinent parameters with the highlighted parameters as indicated on the final
configuration documents from staging.
Required Test Equipment:
•
Laptop with Floppy Disk Drive
•
PC operating system and HyperTerminal
•
Blank floppy disk
•
Cisco® "Black Connection Cable"
•
Cisco 9-pin "D" shell to RJ-45 adapter
•
Or, 9-Pin Male to 9-Pin Female w/Null Adapter
Содержание P5100 Series
Страница 2: ...Installation Manual MM102225V1 Rev B Jul 05 Base Station Tower Site ...
Страница 70: ...MM102225V1 Rev B 69 This page intentionally left blank ...
Страница 72: ...MM102225V1 Rev B 71 This page intentionally left blank ...
Страница 74: ...MM102225V1 Rev B 73 This page intentionally left blank ...
Страница 76: ...MM102225V1 Rev B 75 This page intentionally left blank ...
Страница 82: ...MM102225V1 Rev B 81 PARAMETER VALUE EXPLANATION password cisco login end buck40sas ...
Страница 92: ...MM102225V1 Rev B 91 This page intentionally left blank ...
Страница 94: ...MM102225V1 Rev B 93 This page intentionally left blank ...
Страница 96: ...MM102225V1 Rev B 95 This page intentionally left blank ...
Страница 99: ...MM102225V1 Rev B 98 This page intentionally left blank ...