MM102225V1, Rev. B
3
TABLE OF CONTENTS
Page
1.0
GENERAL INFORMATION.............................................................................................................................6
1.1.
INTRODUCTION .............................................................................................................................................6
1.2.
REFERENCE
MATERIAL ...............................................................................................................................6
1.3.
TOOLS
AND
TEST
EQUIPMENT...................................................................................................................7
1.4.
TOOLS
REQUIRED
FOR
SPECIFIC
TASK....................................................................................................9
1.5.
SAFETY
INFORMATION ...............................................................................................................................9
1.6.
SAFETY
SYMBOLS ......................................................................................................................................11
1.7.
O
PEN
S
KY
BASE
STATION
EQUIPMENT
SPECIFICATION
(G
ENERAL
) ....................................................12
2.0
SITE PREPARATION......................................................................................................................................13
2.1
INTRODUCTION ...........................................................................................................................................13
2.2
ANTENNA
SYSTEM .....................................................................................................................................13
2.2.1
Antenna Mounting ...................................................................................................................................13
2.2.2
Transmission Lines ..................................................................................................................................13
2.3
TOWER
TOP
AMPLIFIER.............................................................................................................................15
2.4
SITE
REQUIREMENTS .................................................................................................................................15
2.4.1
Floor Plan ...............................................................................................................................................15
2.4.2
Operating Environment ...........................................................................................................................15
2.4.3
Electrical Power ......................................................................................................................................16
2.4.4
Equipment Room Grounding ...................................................................................................................16
2.5
ANTENNA
SYSTEM
QUALITY
AUDIT......................................................................................................16
3.0
BASE STATION INSTALLATION ................................................................................................................18
3.1
BEFORE
INSTALLATION
OCCURS ...........................................................................................................18
3.2
BASICS ...........................................................................................................................................................18
3.3
SECURING
EQUIPMENT
RACKS
TO
THE
FLOOR ...................................................................................19
3.4
CABLING
EQUIPMENT
RACK
COMPONENTS ........................................................................................22
3.4.1
Interrack Cable Connections ...................................................................................................................23
3.4.2
Connecting Power Source and External Equipment................................................................................27
3.4.3
Connect Cabling for the Power Source ...................................................................................................28
3.4.4
Connect Grounding Cables to Equipment Racks.....................................................................................30
3.4.5
Connect Antenna Cables to Equipment Racks.........................................................................................31
3.4.6
Connect the T1 Network ..........................................................................................................................32
3.4.7
Site Clean Up...........................................................................................................................................32
3.5
COMPLETING
THE
INSTALLATION .........................................................................................................32
4.0
SITE TEST PROCEDURES ............................................................................................................................33
4.1
PURPOSE
AND
SCOPE .................................................................................................................................33
4.2
OVERVIEW
OF
OPENSKY
BASE
SITE
EQUIPMENT ...............................................................................34
4.3
TEST
METHODOLOGY................................................................................................................................34
4.4
PREPARATION..............................................................................................................................................35
4.5
RECORDING
TEST
RESULTS......................................................................................................................35
4.6
BASE
SITE
BLOCK
DIAGRAM....................................................................................................................35
4.7
INSPECTION..................................................................................................................................................36
4.7.1
Pre-test Inspection ...................................................................................................................................36
4.7.2
Interrack Cabling ....................................................................................................................................37
4.7.3
New Cabling ............................................................................................................................................39
5.0
EQUIPMENT CONFIGURATION.................................................................................................................42
6.0
PERFORMANCE TESTING ...........................................................................................................................43
6.1
ANALOG
RECEIVE
TESTS
(MANDATORY) .............................................................................................43
Содержание P5100 Series
Страница 2: ...Installation Manual MM102225V1 Rev B Jul 05 Base Station Tower Site ...
Страница 70: ...MM102225V1 Rev B 69 This page intentionally left blank ...
Страница 72: ...MM102225V1 Rev B 71 This page intentionally left blank ...
Страница 74: ...MM102225V1 Rev B 73 This page intentionally left blank ...
Страница 76: ...MM102225V1 Rev B 75 This page intentionally left blank ...
Страница 82: ...MM102225V1 Rev B 81 PARAMETER VALUE EXPLANATION password cisco login end buck40sas ...
Страница 92: ...MM102225V1 Rev B 91 This page intentionally left blank ...
Страница 94: ...MM102225V1 Rev B 93 This page intentionally left blank ...
Страница 96: ...MM102225V1 Rev B 95 This page intentionally left blank ...
Страница 99: ...MM102225V1 Rev B 98 This page intentionally left blank ...