Verify the SAN
For each switch in the fabric, do the following:
1
Reconfirm the switch and port status using the
\Analysis\SwitchLevle\Status
command path
and the
\Analysis\SwitchLevel\Nameserver
command path.
Alternatively, SANman can be used to reconfirm this switch and port status, if
SANman is installed.
2
Reconfirm fabric status using the
\Analysis\FabricLevel\Fabric
command path.
The number of switches should be the same throughout.
3
Verify fabric routing using the
\Analysis\FabricLevel\Route\TopologyShow
command path to verify that there is an out port for every in port.
Figure 3-3
E
XAMPLE
OF
THE
T
OPOLOGY
S
HOW
C
OMMAND
P
ATH
This completes the fabric bring up procedure when all switches are down.
Содержание GFS-2
Страница 1: ...Installation and User Manual for the GFS 2 August 2003...
Страница 2: ......
Страница 4: ......
Страница 13: ...L i g h t S a n d G F S 2 H a r d w a r e G u i d e x...
Страница 15: ...x i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Страница 17: ...x i i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Страница 53: ...C 36 L i g h t S a n d G F S 2 H a r d w a r e G u i d e T r o u b l e s h o o t i n g...
Страница 56: ......