
L i g h t S a n d
G F S - 2 H a r d w a r e G u i d e 3
-
19
S h u t t i n g D o w n t h e F a b r i c
C
H A P T E R
3
C
HAPTER
3
GFS-2 M
AINTENANCE
This chapter provides instructions for basic maintenance procedures for the
GFS-2. The following procedures are covered in this chapter:
• Shutting down the Fabric
• Replacing a Switch
• Recovering from a Power Failure (Disaster Recovery)
• Running Built-In Self-Test (BIST)
Shutting Down the Fabric
Follow these steps for a graceful shutdown of the fabric.
1
Shut down all host devices.
2
Shut down all storage devices.
3
Shut down all edge switches.
4
Shut down all core switches.
Содержание GFS-2
Страница 1: ...Installation and User Manual for the GFS 2 August 2003...
Страница 2: ......
Страница 4: ......
Страница 13: ...L i g h t S a n d G F S 2 H a r d w a r e G u i d e x...
Страница 15: ...x i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Страница 17: ...x i i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Страница 53: ...C 36 L i g h t S a n d G F S 2 H a r d w a r e G u i d e T r o u b l e s h o o t i n g...
Страница 56: ......