Leuze electronic
BCL 558
i
111
TNT
35/7-2
4
V
10.1
Measures to be performed prior to the initial commissioning
Before commissioning, familiarize yourself with the operation and configuration of the
BCL 558
i
.
Before connecting the supply voltage, recheck all connections and ensure that they have
been properly made.
Figure 10.1: Connections of the BCL 558
i
SW IN/OUT
VOUT 1
2
3
4
SWIO_1
SWIO_2
GND
FE
5
HOST / BUS IN
TD+ 1
2
3
4
RD+
RD-
TD-
SERVICE
2 1
3
4
GND D+ D- U
B
PWR
SWIO_4
SWIO_3
3
2
1
4
5
GND
VIN
FE
BUS OUT
TD+ 1
2
3
4
RD+
RD-
TD-
USB socket
Type A
M12 socket
(A-coded)
M12 socket
(D-coded)
M12 socket
(D-coded)
M12 plug
(A-coded)