34
separate power source and cables to activate the valves.
The ignition switch (p.20, figure 8)
must be turned off before following this procedure!
To use emergency lowering without the logic controller, use separate wires to connect a 12
VDC battery to the coils of the control valve block you wish to use (e.g. boom lift valve). It is
possible to use either the starter battery of the access platform or a different external battery.
When the battery is connected to the desired valve, use the hand pump on the inside the valve
casing to power the wanted function. Note: Platform levelling automation does not work when
this procedure is followed, and the platform can tilt into a dangerous angle. Use platform
levelling valve’s coils to straighten the platform.
Содержание 135 NEO
Страница 1: ...Operator and Service manual Version 7 2020 July 2020 ...
Страница 9: ...9 Main dimensions Figure 2 135 NEO Main dimensions side Figure 3 135 NEO main dimensions rear ...
Страница 10: ...10 Reach diagram and support dimensions Figure 4 Reach diagram Figure 5 Support dimensions ...
Страница 59: ...59 Figure 37 Load control of the platform Figure 38 Boom position monitoring ...
Страница 60: ...60 Figure 39 Platform levelling monitoring Figure 40 Outrigger monitoring ...
Страница 61: ...61 Figure 41 Transport position monitoring Figure 42 Prevention of drive function ...
Страница 62: ...62 Figure 43 Selection of the platform control position Figure 44 Selection of the lower control position ...
Страница 63: ...63 Figure 45 Selection of the remote control position Figure 46 Platform emergency stop button override ...
Страница 64: ...64 Figure 47 Platform load monitoring override Figure 48 Override of Safety Functions ...