28
Use of booms
Before operating the booms, make sure the outriggers are properly deployed on solid ground
and the green levelling light is lit. Booms cannot be operated if the rated load of the platform is
exceeded.
1.
Switch the machine on and select the desired control position: platform controls or lower
controls
2.
Start the combustion engine or the electric motor
3.
The booms are controlled with the joystick:
-
push the joystick forward to lift the booms up; pull backward to lower the booms
-
push the joystick left or right to rotate the booms left or right
-
two buttons on the top of the joystick control the telescope: push the left button to
drive the telescope out and the right button to pull the telescope in
4.
When ending the boom operation:
-
First pull the telescope in
-
Rotate the booms to the middle, to transport position. Green indicator light lights up in
the control panel when the middle point is reached (Figure 7 (13))
-
Carefully lower the booms to transport position. Green indicator light lights up in the
control panel when the transport position is reached (Figure 7 (14))
5.
Leguan 135 NEO
has a unique Home Switch (Figure 7 (7)), which can be used to drive the
booms to transport position. See chapter 5.4.2.
Beware of your surroundings when using this
function!
Collision with buildings and other surroundings can cause the lift to fall over and
cause serious damage to people and property around the lift.
Operate the joystick with ease and without hesitation
–
learn to operate the booms precisely.
NOTE: Always lift the booms from transport support first before operating
other movements. When lowering the booms, make sure to drive them
straight down to the transport supports.
NOTE: When a boom movement is prevented at any point there is an
audible beep sound to notify the user of a faulty operation.
Home-Function
Home-function autonomously returns the booms to transport position. The function is
activated by turning the Back to work position/Home-switch (figure 7, switch 7) clockwise to
Home-position and holding it there. To stop the Homing process, release the switch.
When Homing is complete, there will be an audible signal and boom transport position and
boom centre position signal lights will flash.
CAUTION! Pay attention to the surroundings of the access platform! User
must prevent collision with surrounding objects!
Содержание 135 NEO
Страница 1: ...Operator and Service manual Version 7 2020 July 2020 ...
Страница 9: ...9 Main dimensions Figure 2 135 NEO Main dimensions side Figure 3 135 NEO main dimensions rear ...
Страница 10: ...10 Reach diagram and support dimensions Figure 4 Reach diagram Figure 5 Support dimensions ...
Страница 59: ...59 Figure 37 Load control of the platform Figure 38 Boom position monitoring ...
Страница 60: ...60 Figure 39 Platform levelling monitoring Figure 40 Outrigger monitoring ...
Страница 61: ...61 Figure 41 Transport position monitoring Figure 42 Prevention of drive function ...
Страница 62: ...62 Figure 43 Selection of the platform control position Figure 44 Selection of the lower control position ...
Страница 63: ...63 Figure 45 Selection of the remote control position Figure 46 Platform emergency stop button override ...
Страница 64: ...64 Figure 47 Platform load monitoring override Figure 48 Override of Safety Functions ...