
Rev. D
Performance Verification
5-13
c.
DC 50
Ω
Ω
Ω
Ω
!
Recall
xxxP014.PNL
or configure the DSO as shown in 5.6.1
and make the following changes :
Input Coupling
:
DC 50
Ω
Ω
Ω
Ω
on all 4 Channels
Input gain
:
5 mV/div.
on all 4 Channels
Time base
:
2
µµµµ
sec/div.
!
Press
Clear Sweeps.
!
Measure for at least
50 sweeps
, then press
Stop
to halt the acquisition.
!
Record the four
high sdev
parameter values in Table 4, and compare the test
results to the limits in the test record.
!
Repeat the test for Time base :
20
µµµµ
sec/div.
!
Record the measurements (high sdev of 1,2,3,4) in Table 4, and compare the
results to the limits in the test record.
5.7 DC
Accuracy
Содержание Waverunner2 LT262 Series
Страница 1: ...LTXXX2 SM E LeCroy Waverunner2 Series Service Manual Version D December 2003 ...
Страница 30: ...4 12 Theory of Operation Block diagram 1 HAM631 ...
Страница 55: ...Rev D Performance Verification 5 19 ...
Страница 62: ...5 26 Performance Verification Rev D Set Global BWL 200 MHz Set Timebase 5 nsec div ...
Страница 80: ...5 44 Performance Verification Rev D a Pulse Width 10 nsec b Pulse Width 10 nsec ...
Страница 84: ...5 48 Performance Verification Rev D ...
Страница 86: ...Rev D 2 of 12 This page intentionally left blank ...
Страница 96: ...Rev D 12 of 12 LT584 LT374 372 LT354 LT264 262 Test Record This page intentionally left blank ...
Страница 114: ...6 18 Maintenance ...
Страница 126: ...7 12 Mechanical Parts Removal F2 ...
Страница 154: ...Mechanical Part Removal 7 21 ...