30
ENGLISH
3. Installation
t 5IFJOTUBMMBUJPONVTUCFDBSSJFEPVUCZBVUIPSJ[FE-B4BO.BSDPUFDIOJDBMQFSTPOOFM
t 5IFDPGGFFNBDIJOFJTEFMJWFSFEJOBTVJUBCMFQBDLJOH5IFQBDLJOHDPOUBJOTUIFNBDIJ
-
OFBOEJUTBDDFTTPSJFTUIFVTFSNBOVBMBOEUIFDPOGPSNJUZEFDMBSBUJPO"GUFSPQFOJOH
UIFQBDLJOHDIFDLUIFQSPQFSDPOEJUJPOPGUIFDPGGFFNBDIJOFBOEJUTDPNQPOFOUT*O
DBTFPGEPVCUEPOPUVTFUIFBQQMJBODFBOEDPOUBDU-B4BO.BSDP4Q"
t "MMPGUIFQBDLBHJOHNVTUCFDBSFGVMMZDPOTFSWFEJODBTFUIFNBDIJOFOFFETUPCFUSBO
-
sported in the future.
t 5IF NBDIJOF TIPVME CF QMBDFE PO B QFSGFDUMZ IPSJ[POUBM QMBOF TVGmDJFOUMZ TUVSEZ UP
TVQQPSUUIFXFJHIUPGUIFNBDIJOFXJUIBTVGmDJFOUDMFBSBODFBSPVOEJUUPEJTTJQBUFUIF
heat generated during its operation.
t %POPUJOTUBMMUIFFTQSFTTPDPGGFFNBDIJOFJOQMBDFTXIFSFDMFBOJOHJTMJLFMZUPCFDBS
-
SJFEPVUXJUIKFUTPGXBUFS%POPUJNNFSHFUIFVOJUJOXBUFSUPDMFBOJU
t 'PSTBGFUZBHBJOTUIB[BSETSFMBUFEUPFMFDUSJDBMDVSSFOUTLFFQUIFNBDIJOFBXBZGSPN
TJOLTUVCTBRVBSJVNTUBQTBOEBSFBTUIBUBSFXFUPSXIFSFXBUFSNBZTQMBTI
t 5IFNBDIJOFDSFBUFTIFBU5IFSFGPSFJUOFFETUPCFQMBDFEJOBSPPNUIBUJTTVGmDJFOUMZ
WFOUJMBUFEUPFOTVSFIFBUEJTTJQBUJPO,FFQUIFNBDIJOFBXBZGSPNTPVSDFTPGEJSFDU
heat.
t .BLFTVSFUIBUUIFWPMUBHFPGUIFQPXFSTPDLFUEPFTOPUEJGGFSGSPNUIBUJOEJDBUFEPO
UIFUFDIOJDBMEBUBBOEPOUIFJEFOUJmDBUJPOUBHPOUIFNBDIJOF*GUIFWPMUBHFJTEJGGF
-
SFOUEPOPUDPOOFDUUIFNBDIJOF5IJTNBZCFEBOHFSPVTBOENBZEBNBHFUIFVOJU
3.1 Equipment provided
The machine packing contains the equipment kit, which includes the following items:
– filter cups with filter restraint ring
– filters for filter cups (single and double doses)
– blind filter for filter cup
– spouts for filter cups (single and double doses)
– press for ground coffee
– rubber tube with stainless steel mesh for water connection (water circuit - water softener)
– rubber drain hose with steel coil for water drain
– 3/8” nipples for hose connection to water supply tube
– cleaning brush for serving units
3.2 Water mains set-up
FEEDING LINE
Bring the water feeding tube (of at least 3/8” diameter) up to the machine and install an on-off valve (preferably of
3/8” ball type) that allows a rapid opening and closing operation.
DRAIN LINE
Provide an inspectable drainage pit on the floor connected with the sink drainage line, suitable for receiving
the machine gravity drainage tube. The drain tube must be positioned so that the water flows out freely, with-
out possibility for the pipe to clog up during the operation.
3.3 Water softener (optional)
5IF XBUFS TPGUFOFS GPS TPGUFOJOH UIF NBJOT XBUFS DBO CF NBOVBM PS BVUPNBUJD EFQFOEJOH PO
customer’s request.
#FGPSFDPOOFDUJOHUIFXBUFSTPGUFOFSUPUIFDPGGFFNBDIJOFUIFSFTJOTDPOUBJOFEJOJUTIPVMECF
XBTIFEPGGBTEFTDSJCFEJOUIFVTFSTNBOVBMTVQQMJFEXJUIUIFBQQMJBODF
/PUF
5IFXBUFSTPGUFOFSJTDPOTJEFSFEBOFTTFOUJBMEFWJDFUPHVBSBOUFFBQSPQFSPQFSBUJPOPGUIFFTQSFTTPDPGGFFNB
-
DIJOF"XBUFSTPGUFOJOHTZTUFNTIPVMECFQSPWJEFEJOPSEFSUPHVBSBOUFFUIFFGmDJFODZQFSGPSNBODFBOEEVSBUJPO
of the components in the machine.
Содержание 100 DTC E/S
Страница 1: ...Series 100 La San Marco New Hundred LIGHT YEARS AHEAD ...
Страница 2: ...An Italian myth a pleasure without borders Series 100 La San Marco Made in Italy ...
Страница 10: ...ITALIANO USO E MANUTENZIONE SERIE 100 ...
Страница 32: ...ENGLISH USE AND MAINTENANCE SERIES 100 ...
Страница 53: ...44 ENGLISH ...
Страница 54: ...FRANÇAIS EMPLOI ET ENTRETIEN SÉRIE 100 ...
Страница 76: ...DEUTSCH BEDIENUNG UND WARTUNG SERIE 100 ...
Страница 99: ...90 DEUTSCH ...
Страница 100: ...ESPAÑOL USO Y MANTENIMIENTO SERIE 100 ...
Страница 122: ...PORTUGÛES MANUAL DE USO E MANUTENÇÃO SÉRIE 100 ...
Страница 143: ...134 PORTUGÛES ...
Страница 144: ...E HNIKA ΡΗΣΗ ΚΑΙ ΣΥΝΤΗΡΗΣΗ ΣΕΙΡΑ 100 ...