2RG/2RH
2-4-21
F34X
Abnormality detecting in the Panel Manage-
ment Department
1. Check the harness between Panel<=>Main boards, and the connection state of a connec-
tor, and perform an operation check.
2. Initialize HDD and perform an operation check.
(FULL of U024) *
3. U021 Controller backup initialization is carried out and an operation check is performed.
4. Exchange a Panel board and perform an operation check.
5. Exchange a Main board and perform an operation check.
6. Get USBLOG and contact service headquarters.
* Only HDD standard model
[Main <=> Panel]
Main PWB: YC12
Panel PWB: YC5
F35X
Abnormality detecting in the printing controlling
Management Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
F37X
Abnormality detecting in the FAX Management
Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Perform a deed operation check for DIMM Clear by U671.
(Since it disappears when received data remain, cautions are required.) * notes
4. Exchange FAX_DIMM and perform an operation check.
* Notes
5. Exchange a Main board and perform an operation check.
6. Exchange HDD and perform an operation check.
*
7. Get USBLOG and contact service headquarters.
* Only HDD standard model
* Note Only model which has Flash for FAX data in a Main board
No Flash for FAX data
When OFF of the security kit that
replaced the HDD to the SSD.
F38X
Abnormality detecting in the authentication
authorized Management Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
F3AX
F3BX
F3CX
F3DX
F3EX
F3FX
F40X
F41X
F42X
F43X
F44X
F45X
Abnormality detecting in the Entity Manage-
ment Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Number
Contents
Verification procedure & check point
Remarks
Content
Содержание Copystar CS 3011i
Страница 1: ...SERVICE MANUAL Published in September 2016 2RHSM 1 Rev 1 6 3011i 6 3511i ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 78: ...2RG 2RH 1 2 51 B B A A B B A A B B A A Tray lower cover Pin Pin ...
Страница 79: ...2RG 2RH 1 2 52 11 Attach the tray lower cover 12 Fix the tray lower cover by using two pins Figure 1 2 77 ...
Страница 83: ...2RG 2RH 1 2 56 This page is intentionally left blank ...
Страница 496: ...2RG 2RH 2 1 18 Figure 2 1 23 Duplex conveying section block diagram EPWB DU_SENS DU_CL_REM YC13 A5 YC15 1 DUCL DUS ...
Страница 504: ...2RG 2RH 2 2 8 This page is intentionally left blank ...
Страница 568: ...Installation Guide DP 7100 Document processor Installation Guide ...
Страница 572: ...2 1mm 0mm ն ո պ ջ չ շ A D C B B A ...
Страница 573: ...3 ռ ս վ ր ւ ց տ E A ...
Страница 574: ...4 ք द I M3x8 փ F G M4x10 K J H A ...
Страница 575: ...5 ON ध A ...
Страница 577: ...7 շ յ ն ո D E B ...
Страница 578: ...8 չ պ F G M4x10 H I M3x8 K J ջ B ...
Страница 579: ...9 ռ B ...
Страница 589: ...19 ո ն շ պ ջ չ 8 6 7 10 11 9 A B ...
Страница 599: ...DP 7110 Document processor Installation Guide ...
Страница 603: ...2 շ շ 2 շ 2 շ C M4x14 E ߑ ߒ ߓ ߔ ո շ 2 ߑ ն A ...
Страница 604: ...3 ߘ ո ߕ ߗ ո չ պ ջ ߖ F G H M3x8 BLACK A ...
Страница 605: ...4 ռ վ ր ւ ց ࠉտ ս I A ...
Страница 606: ...5 J L փ ք द K M3x8 K M3x8 K M3x8 ध A ...
Страница 607: ...6 ऩ प भ फ ब न म O N A ...
Страница 608: ...7 ON य A ...
Страница 610: ...9 շ ո շ 2 շ 2 շ 2 ߑ ն շ ߑ ߒ ߓ ߔ C M4x14 E B ...
Страница 611: ...10 ߖ ߕ ߘ ߎ չ պ ջ ߗ F G ո H M3x8 BLACK B ...
Страница 612: ...11 ռ ս տ ր ց վ I B ...
Страница 613: ...12 ւ ք द ध न փ J L P K M3x8 K M3x8 B ...
Страница 614: ...13 ऩ प फ O N B ...
Страница 634: ...DP 7120 Document processor Installation Guide ...
Страница 638: ...2 1mm 0mm ն շ ո չ ջ պ B B A D C A ...
Страница 639: ...3 ռ ս վ տ ց ր E A ...
Страница 640: ...4 G ւ F F ք փ H ON 10 mm 10 mm A ...
Страница 642: ...6 շ ո յ ն D B ...
Страница 643: ...7 չ E B ...
Страница 644: ...8 F ON G պ F ջ ռ H 10 mm 10 mm B ...
Страница 653: ...17 ղ ն շ ճ մ յ 2 6 7 3 4 5 A B ...
Страница 655: ...19 չ ջ պ ս վ ռ 9 11 10 13 14 12 10 mm A B ...
Страница 665: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 673: ...PF 810 3000 sheet deck Installation Guide ...
Страница 686: ...DF 791 3000 sheet finisher Installation Guide ...
Страница 701: ...DF 7120 1000 sheet finisher Installation Guide ...
Страница 705: ...2 մ յ ն 7 7 15 a b a a b b b a A ...
Страница 706: ...3 ո շ չ պ A ...
Страница 707: ...4 ջ ռ ս c d 14 c d c d 12 c d ջ ռ ս c d 14 c d c d 12 c d A ...
Страница 708: ...5 վ ր D ց ON տ A ...
Страница 710: ...7 L յ մ ն շ B ...
Страница 712: ...9 ս ռ վ տ G B ...
Страница 713: ...10 ր ց ւ b a 17 17 25 a b a a b b B ...
Страница 714: ...11 ք փ द c d 24 c d c d 22 c d B ...
Страница 715: ...12 न ध ऩ प B ...
Страница 716: ...13 ब फ ON D B ...
Страница 719: ...AK 740 Bridge unit Installation Guide ...
Страница 721: ...MT 730 Mailbox Installation Guide ...
Страница 736: ...PH 7A C D Punch unit Installation Guide ...
Страница 757: ...DT 730 B Document tray Installation Guide ...
Страница 759: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 760: ...FAX System 12 Installation Guide ...