PERIODIC REPLACEMENT OF DEFINED LIFE PARTS
For using the machine safely for an extended period of time, you must periodically replace the safety critical and
fire prevention-related parts listed in the table of the defined life parts.
Material quality of these parts can change as time passes and they are likely to wear out or deteriorate. Howev-
er, it is difficult to determine the extent of wear or deterioration at the time of periodic maintenance. Hence, it is
required to replace them with new ones regardless of their condition after a certain period of usage. This is im-
portant to ensure that these parts maintain their full performance at all times.
Furthermore, should anything abnormal be found on any of these parts, replace it with a new one even if the
periodic replacement time for the part has not yet arrived.
If any of the hose clamps show deterioration like deformation or cracking, replace the clamps at the same time
as the hoses.
Also perform the following checks with hydraulic hoses which need not to be replaced periodically. Tighten all
loose hoses and replace defective hoses, as required.
When replacing hoses, always replace O-rings, gaskets, and other such parts at the same time.
Have your Komatsu distributor replace the defined life parts.
DEFINED LIFE PARTS LIST
No.
Parts for periodic replacement
Replacement interval
1
Fuel system
Fuel hose
Spill hose
Every 2 years or 4000 hours,
whichever comes sooner
2
Engine lubrication system
Engine oil filter hose
3
Work equipment hydraulic
system
Main pump delivery hose
Main pump LS hose
Swing line hose
External work equipment hose
•
Boom foot connection hose
•
Boom cylinder hose
•
Arm connection hose
•
Arm cylinder hose
•
Bucket cylinder hose
•
Travel line hose
•
Attachment additional line hose
•
Blade cylinder hose
•
Boom swing cylinder hose
4
Others
PPC accumulator
Seat belt
Every 3 years from start of us-
age or 5 years after manufac-
turing of seat belt, whichever
comes sooner
PERIODIC REPLACEMENT OF DEFINED LIFE PARTS
REPLACEMENT PARTS
7-2
WENAM00241
Содержание PC80MR-5E0
Страница 2: ......
Страница 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Страница 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Страница 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Страница 267: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00241...
Страница 343: ...SPECIFICATIONS 5 1 WENAM00241...
Страница 394: ...WENAM00241...
Страница 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Страница 411: ......
Страница 412: ......