If Hi is displayed, press the travel speed selector switch to
change the travel speed to Lo.
6.
Set the lock lever to FREE position (F).
7.
Operate the work equipment control lever to swing the up-
per structure so that the work equipment is on the sprocket
side.
At this time, set the undercarriage and upper structure in
parallel.
8.
Before moving the machine onto the ramps, check that the
machine is positioned in a straight line with the ramps and
that the centerline of the machine matches that of the trail-
er.
9.
Pull the travel levers backward and drive the machine
slowly toward the ramps.
Lower the work equipment as far as possible without causing interference.
On the ramps, do not operate any other lever than travel lever.
10. When the machine rides on the platform of the trailer, stop
the machine and swing the upper structure slowly by 180 °.
RKA63210
TRANSPORTATION
OPERATION
3-178
WENAM00241
Содержание PC80MR-5E0
Страница 2: ......
Страница 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Страница 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Страница 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Страница 267: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00241...
Страница 343: ...SPECIFICATIONS 5 1 WENAM00241...
Страница 394: ...WENAM00241...
Страница 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Страница 411: ......
Страница 412: ......