8.
Remove the cap of oil filler port (F) gradually to release the
internal pressure.
Release the internal pressure.
9.
Remove the hoses on the attachment side. Install the
plugs to outlets (2 places).
The plugs are used to prevent the attachment from making
incorrect operation caused by mixing in of foreign matter.
After the plugs are correctly installed, store the attach-
ment.
10. Pull out the mounting pins (2 places), remove the attach-
ment, then install the bucket.
For the installation procedure of the bucket, see OPERA-
TION “METHOD FOR REPLACING BUCKET”.
After installing the bucket, check the oil level in the hydraulic tank.
METHOD FOR INSTALLING ATTACHMENT
1.
Remove the bucket.
For the removal procedure of the bucket, see OPERATION “METHOD FOR REPLACING BUCKET”.
RKA69060
ATTACHMENTS AND OPTIONS
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
6-17
WENAM00241
Содержание PC80MR-5E0
Страница 2: ......
Страница 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Страница 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Страница 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Страница 267: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00241...
Страница 343: ...SPECIFICATIONS 5 1 WENAM00241...
Страница 394: ...WENAM00241...
Страница 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Страница 411: ......
Страница 412: ......