7.
Set the lock lever to LOCK position (L).
8.
Turn the starting switch to OFF position (A).
9.
Open dirt cover (1).
Open dirt cover (1) fully and it will be secured by cover
support lever (2).
10. Remove the cap of oil filler port (F) gradually to release the
internal pressure.
Release the internal pressure.
11. Check that the hydraulic oil temperature is low.
12. Remove the plugs (2 places) at the outlet and inlet.
Be careful not to get any dirt or mud on the hose fitting.
If O-ring is damaged, replace it with a new one.
RKA69060
ATTACHMENTS AND OPTIONS
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
6-19
WENAM00241
Содержание PC80MR-5E0
Страница 2: ......
Страница 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Страница 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Страница 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Страница 267: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00241...
Страница 343: ...SPECIFICATIONS 5 1 WENAM00241...
Страница 394: ...WENAM00241...
Страница 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Страница 411: ......
Страница 412: ......