2.
Place the attachment on a horizontal place, install pin (A)
and then pin (B) in this order to the arm.
3.
Lower the attachment to the ground and stop the engine.
4.
Turn the starting switch to ON position (B).
5.
Set the lock lever to FREE position (F).
6.
Operate each control lever (work equipment, travel) and
attachment control switch fully in each direction within 15
seconds after the engine is stopped to release the internal
pressure in the hydraulic circuit.
RKA63210
RKA64020
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
ATTACHMENTS AND OPTIONS
6-18
WENAM00241
Содержание PC80MR-5E0
Страница 2: ......
Страница 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Страница 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Страница 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Страница 267: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00241...
Страница 343: ...SPECIFICATIONS 5 1 WENAM00241...
Страница 394: ...WENAM00241...
Страница 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Страница 411: ......
Страница 412: ......