17-

 

breaking the viscometer, do not pull from the front 
tube. 

 

 

Figure 10. Uninstalling the viscometer from the optical 

sensor. 

 

When ready for a test, the assembly is placed into 
the instrument by carefully lowering it through the 
viscometer port. Plug the sensor into a sensor 
port. 

NOTE

:  Make  sure  the  fibers  are  of  equal  length 

before plugging in  (See Figure 11, below).  

 

 

Figure 11. Fiber length for sensor plug 

 

5.4  Adjusting the Sensors 

 

In  order  for  the  optical  sensors  to  provide 

optimal performance, adjustments can be made to 
their  sensitivity  in  detecting  fluid  movement  past 
each of the timing positions. 

Figure  12  shows  the  viscosity  bath  with  the 

viewing  mirror  placed  on  top  of  the  bath.  The 
viewing  mirror  allows  the  operator  to  easily  make 
adjustments  to  the  sensors  while  remaining  in 

front of the bath. Figure 13 shows a close up view 
of  the  sensor  indicator  lights  and  adjustment 
screws. Each sensor indicator corresponds to two 
wires  leading  up  to  two  sensor  devices,  the 
transmitter and the receiver.  

When  the  signal  can  pass  between  the  two 

sensors,  the  upper  orange  light  will  be  on.  When 
the signal is interrupted (when a meniscus passes 
through)  the  orange  light  will  flicker  or  turn  off.  
The  three  lights  correspond  to  the  three  possible 
sensors  in  an  assembly.  Note  that  some 
assemblies only have two. 

 

 

Figure 12. Viewing Mirror 

 

 

Figure 13. Sensor Indicator Lights and Adjustment Screws 

 

For  optimal  performance,  the  adjustment 

screw  must  be  set  at  the  threshold  exactly  when 
the sensors can detect a signal (when the orange 
light is ON).  

 

1.  Engage  a  viscometer  filled  with  sample  into 

the assembly. Place it into the bath and plug 
it into the sensor ports.  

 
2.  Start an Automatic test (See Section 5.5. Do 

NOT uncork the tube; it must be filled during 
this adjustment).  

 
3.  The  orange  light  should  be  ON.  Begin  to 

turn  the  screw  COUNTERCLOCKWISE.  As 
you turn, the orange light will begin to flicker 
and eventually turn off. Turn the screw back, 
CLOCKWISE. The light begins to flicker and 
then  turn  back  ON.  Adjust  the  screw  back 
and forth until it is set to where the light just 
turns  back  ON.  The  closer  the  screw  is  set 
at this threshold with the light ON, the more 
sensitive the sensor is. 

4.  Repeat adjustment for each sensor signal. 
 
5.  Stop the test by pressing F2/Stop.  

Содержание KV5000

Страница 1: ...ia New York 11716 1796 USA Toll Free 1 800 878 9070 US only Tel 1 631 589 3800 Fax 1 631 589 3815 http www koehlerinstrument com e mail info koehlerinstrument com Petroleum Testing Analysis Instrument...

Страница 2: ......

Страница 3: ...h the applicable standards set forth in this certification Specifications ASTM D445 ASTM D2532 ASTM D6074 ASTM D6158 IP 71 ISO 3104 DIN 51550 FTM 791 305 NF T 60 100 This unit is tested before it leav...

Страница 4: ......

Страница 5: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 1...

Страница 6: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 2...

Страница 7: ...is given cataloging the items that require separation from the equipment along with basic information on subsequent processing or recycling prior to disposal of the equipment http www dpa system dk e...

Страница 8: ...mum the following substances preparations and components have to be removed from any separately collected WEEE Mercury containing components such as switches or backlighting lamps compact fluorescent...

Страница 9: ...tion 14 5 1 Bath 14 5 2 Power 15 5 3 Engage the Viscometer in Optical Sensor Assembly 15 5 4 Adjusting the Sensors 17 5 5 Control Panel Operation 18 5 6 Test Procedure 19 6 Safety Features 21 6 1 Over...

Страница 10: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 6 10 Service 27 11 Storage 27 12 Warranty 27 13 Returned Goods Policy 27 Notes 28...

Страница 11: ...range of accurate and reliable instrumentation as well as support for your laboratory testing programs Please do not hesitate to contact us at any time with your inquiries about equipment tests or tec...

Страница 12: ...s Any modification or alteration of this equipment from that of factory specifications is not recommended voids the manufacturer warranty product safety performance specifications and or certification...

Страница 13: ...box and remove packing foam 6 Extract instrument and place on suitable cart for transportation to work area lab bench WARNING Be sure two or more individuals are available for extracting and lifting...

Страница 14: ...quipment WARNING Certain mechanical stresses applied to the tempered glass front panel and inner the inner borosilicate glass jar pose a hazard to personnel Impacts to these during normal operation ca...

Страница 15: ...t This port allows for independent temperature measurement of the bath temperature with a thermometer or a Pt 100 RTD probe for precise temperature measurements and digital temperature controller cali...

Страница 16: ...8 500 C02 OS 500 8 1 600 to 8 000 378 600 C02 OS 600 20 4 000 to 20 000 378 650 C02 OS 650 45 9 000 to 45 000 378 700 C02 OS 700 100 20 000 to 100 000 Ubbelohde Viscometers Ubbelohde viscometers measu...

Страница 17: ...eter holders for use with the KV 5000 The correct holder must be used with the corresponding viscometer tube for proper operation Viscometer Tube Type Corresponding Holder Cannon Fenske Routine K23381...

Страница 18: ...ol to learn the heating parameters needed for any particular set point temperature This operation should be done when installing a new unit after replacing or changing the bath medium type or utilizin...

Страница 19: ...or volatilize producing flammable vapors below the maximum instrument operating temperature 25 C NOTE Coloration of the Mineral or Silicon Bath Oil is an indication that the Medium must be changed Se...

Страница 20: ...e Figure 8 Viscometer Tube Completely Inserted in the Optical Sensor Assembly Optical wires are not shown for illustrative purposes only If the optical sensor assembly has a Teflon retaining ring rath...

Страница 21: ...d the receiver When the signal can pass between the two sensors the upper orange light will be on When the signal is interrupted when a meniscus passes through the orange light will flicker or turn of...

Страница 22: ...he viscometer parameters displayed 4 Test Data Displays the run time during a test in seconds Time 1 indicates the elapsed time for a standard test for a viscometer with a single constant The Time 2 i...

Страница 23: ...test procedure listed in section 1 2 of this document when performing Kinematic viscosity testing After the main power switch to the instrument is turned on the control panel will illuminate and disp...

Страница 24: ...n The status will automatically change from RUN to RUN 2 Once the sample passes the second indicator line on the viscometer tube the TIME 2 will automatically stop the status will change from RUN 2 to...

Страница 25: ...s providing proper and adequate voltage Check if Overpower Protection circuitry located directly behind the temperature controller inside the front tray has been activated Check if line switch is in t...

Страница 26: ...ose of this material and its container to a hazardous of special waste collection point Country State or local laws may impose additional regulatory requirements regarding disposal Dispose in accordan...

Страница 27: ...from the main instrument it is now easy to access the inside of the bath jar for further cleaning 16 With the top assembly resting on its back it is now possible to clean the heating coils stirrer bl...

Страница 28: ...low Blow Fuse 0 25A 5x20 mm 278 003 001 Slow Blow Fuse 3 15A 5x20mm 278 020 004 Time Delay Fuse 20A 600VAC 278 102 003 Fast Acting Fuse 0 5A 2AG 275 103 044 Temperature Controller 100 240V with RS 232...

Страница 29: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 25 9 Wiring Diagrams 9 1 Unit Wiring...

Страница 30: ...t for Amp 3 3 Brown 9 9 Blue Y3 V White 10 10 Blue Black X6 Output for Amp1 White 11 11 Blue White X7 Output for Amp 2 White 12 12 Blue Red X10 Output for Amp 3 4 Brown 13 13 White Y4 V White 14 14 Wh...

Страница 31: ...f the product to the factory The sole responsibility of Koehler Instrument Company and the purchaser s exclusive remedy for any claim arising out of the purchase of any product is the repair or replac...

Страница 32: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 28 Notes...

Страница 33: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 29 Notes...

Страница 34: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 30 Notes...

Отзывы: