Koehler KV5000 Скачать руководство пользователя страница 15

KV5000 Instrument & Software 

Operation and Instruction Manual 

 

KV5000-Manual

    

 

-

11-

 

4  Descriptions

 

 

4.1  Instrument Controls 

 

 

 

 

Figure 3: Instrument Descriptions 

 

1.  Power Switch.

 This switch controls the power 

to the entire unit. When the power switch is in 
the 

ON

  position,  the  digital  temperature 

controller,  the  stirrer,  and  the  optical  sensors 
power supply are powered on. 

 

2.  Lamp  Switch.

  This  switch  controls  turning 

ON/OFF

  the  lamp  for  illuminating  the  test 

samples. 

 

3.  Temperature  Controller.

  The  temperature 

controller  regulates  the  bath  temperature  for 
the test procedure. Refer to Section 4.3 for full 
operational details. 

 

4.  Bath/  Bath  Stirrer: 

The  stirrer  constantly 

circulates 

bath 

medium 

to 

prevent 

temperature 

gradients 

and 

ensures 

temperature  stability.  When  cleaning  and/or 
servicing,  please  be  sure  to  disconnect  unit 
power to avoid possible injury. 

 

5.  Temperature  Regulation: 

The  heater  coils 

stabilize  the  bath  temperature  to  desired 
setting  within  ±  0.02°C.  Running  coolant 
through  the  cooling  coils  allows  bath  to 
maintain temperatures near or below ambient. 

 

6.  Viscometer  Ports: 

The  viscometer,  once 

engaged  into  the  assembly,  is  placed  into  the 
bath  through  the  viscometer  ports  on  top  of 
the instrument. 

 

7.  Thermometer/Thermocouple  Port: 

This  port 

allows 

for 

independent 

temperature 

measurement  of  the  bath  temperature  with  a 
thermometer  or  a  Pt-100  RTD  probe  for 
precise temperature measurements and digital 
temperature  controller  calibration.  If  the 
controller  needs  to  be  calibrated,  then  please 
contact 

the 

Koehler 

technical 

service 

department. 

 

8.  Optical  Sensor  Ports: 

The  optical  sensors 

are connected to the instrument through these 
ports  numbered  1-5.  Note  that  an  outline  of 
the plug is  provided to ensure that the plug is 
inserted into the proper position.  

 

9.  Interface

:  Here  the  user  can  set  operation 

parameters  and  view  results  on  the  touch 
screen digital display. 

 

4.2  Accessories for Running Tests 

 
Glass Capillary Viscometer Tubes for KV5000 

Koehler offers a full selection of glass capillary 
kinematic viscometers, which are ordered 
separately from the KV5000 instrument, for 
measuring kinematic viscosity of liquid products as 
per ASTM D445 and related standard test 
methods. All types of viscometers conform to 
ASTM D445 and related methods for glass 
capillary kinematic viscometers. All viscometers 
with part numbers for the automatic test are listed 
below. The constant for each individual viscometer 
is written on the Certificate of Calibration, included 
in the packaging.  
 

IMPORTANT:

  It  is  recommended  when  using  a 

new viscometer for the first time to run a test with 
suitable standard. Different locations may result in 
a slightly different constant. 

 

Содержание KV5000

Страница 1: ...ia New York 11716 1796 USA Toll Free 1 800 878 9070 US only Tel 1 631 589 3800 Fax 1 631 589 3815 http www koehlerinstrument com e mail info koehlerinstrument com Petroleum Testing Analysis Instrument...

Страница 2: ......

Страница 3: ...h the applicable standards set forth in this certification Specifications ASTM D445 ASTM D2532 ASTM D6074 ASTM D6158 IP 71 ISO 3104 DIN 51550 FTM 791 305 NF T 60 100 This unit is tested before it leav...

Страница 4: ......

Страница 5: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 1...

Страница 6: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 2...

Страница 7: ...is given cataloging the items that require separation from the equipment along with basic information on subsequent processing or recycling prior to disposal of the equipment http www dpa system dk e...

Страница 8: ...mum the following substances preparations and components have to be removed from any separately collected WEEE Mercury containing components such as switches or backlighting lamps compact fluorescent...

Страница 9: ...tion 14 5 1 Bath 14 5 2 Power 15 5 3 Engage the Viscometer in Optical Sensor Assembly 15 5 4 Adjusting the Sensors 17 5 5 Control Panel Operation 18 5 6 Test Procedure 19 6 Safety Features 21 6 1 Over...

Страница 10: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 6 10 Service 27 11 Storage 27 12 Warranty 27 13 Returned Goods Policy 27 Notes 28...

Страница 11: ...range of accurate and reliable instrumentation as well as support for your laboratory testing programs Please do not hesitate to contact us at any time with your inquiries about equipment tests or tec...

Страница 12: ...s Any modification or alteration of this equipment from that of factory specifications is not recommended voids the manufacturer warranty product safety performance specifications and or certification...

Страница 13: ...box and remove packing foam 6 Extract instrument and place on suitable cart for transportation to work area lab bench WARNING Be sure two or more individuals are available for extracting and lifting...

Страница 14: ...quipment WARNING Certain mechanical stresses applied to the tempered glass front panel and inner the inner borosilicate glass jar pose a hazard to personnel Impacts to these during normal operation ca...

Страница 15: ...t This port allows for independent temperature measurement of the bath temperature with a thermometer or a Pt 100 RTD probe for precise temperature measurements and digital temperature controller cali...

Страница 16: ...8 500 C02 OS 500 8 1 600 to 8 000 378 600 C02 OS 600 20 4 000 to 20 000 378 650 C02 OS 650 45 9 000 to 45 000 378 700 C02 OS 700 100 20 000 to 100 000 Ubbelohde Viscometers Ubbelohde viscometers measu...

Страница 17: ...eter holders for use with the KV 5000 The correct holder must be used with the corresponding viscometer tube for proper operation Viscometer Tube Type Corresponding Holder Cannon Fenske Routine K23381...

Страница 18: ...ol to learn the heating parameters needed for any particular set point temperature This operation should be done when installing a new unit after replacing or changing the bath medium type or utilizin...

Страница 19: ...or volatilize producing flammable vapors below the maximum instrument operating temperature 25 C NOTE Coloration of the Mineral or Silicon Bath Oil is an indication that the Medium must be changed Se...

Страница 20: ...e Figure 8 Viscometer Tube Completely Inserted in the Optical Sensor Assembly Optical wires are not shown for illustrative purposes only If the optical sensor assembly has a Teflon retaining ring rath...

Страница 21: ...d the receiver When the signal can pass between the two sensors the upper orange light will be on When the signal is interrupted when a meniscus passes through the orange light will flicker or turn of...

Страница 22: ...he viscometer parameters displayed 4 Test Data Displays the run time during a test in seconds Time 1 indicates the elapsed time for a standard test for a viscometer with a single constant The Time 2 i...

Страница 23: ...test procedure listed in section 1 2 of this document when performing Kinematic viscosity testing After the main power switch to the instrument is turned on the control panel will illuminate and disp...

Страница 24: ...n The status will automatically change from RUN to RUN 2 Once the sample passes the second indicator line on the viscometer tube the TIME 2 will automatically stop the status will change from RUN 2 to...

Страница 25: ...s providing proper and adequate voltage Check if Overpower Protection circuitry located directly behind the temperature controller inside the front tray has been activated Check if line switch is in t...

Страница 26: ...ose of this material and its container to a hazardous of special waste collection point Country State or local laws may impose additional regulatory requirements regarding disposal Dispose in accordan...

Страница 27: ...from the main instrument it is now easy to access the inside of the bath jar for further cleaning 16 With the top assembly resting on its back it is now possible to clean the heating coils stirrer bl...

Страница 28: ...low Blow Fuse 0 25A 5x20 mm 278 003 001 Slow Blow Fuse 3 15A 5x20mm 278 020 004 Time Delay Fuse 20A 600VAC 278 102 003 Fast Acting Fuse 0 5A 2AG 275 103 044 Temperature Controller 100 240V with RS 232...

Страница 29: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 25 9 Wiring Diagrams 9 1 Unit Wiring...

Страница 30: ...t for Amp 3 3 Brown 9 9 Blue Y3 V White 10 10 Blue Black X6 Output for Amp1 White 11 11 Blue White X7 Output for Amp 2 White 12 12 Blue Red X10 Output for Amp 3 4 Brown 13 13 White Y4 V White 14 14 Wh...

Страница 31: ...f the product to the factory The sole responsibility of Koehler Instrument Company and the purchaser s exclusive remedy for any claim arising out of the purchase of any product is the repair or replac...

Страница 32: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 28 Notes...

Страница 33: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 29 Notes...

Страница 34: ...KV5000 Instrument Software Operation and Instruction Manual KV5000 Manual 30 Notes...

Отзывы: